Laserfiche WebLink
1• <br />2.05.3 <br />Sediment pond F collects run -off from the new gob disposal area. Pond F is a <br />typical sediment pond, capable of containing the run -off from a 10 -year event with an <br />emergency spillway system designed to handle the peak flow generated by the 25- <br />year storm event. The initial sections of the emergency spillway are riprap plated <br />open channels. Flow is conveyed over the fire Mountain Canal in a metal flume. <br />Dewatering of Pond F will be by pumping through a buried 4 -inch diameter primary <br />spillway pipe that discharges into D -Gulch where the flow goes under SH -1336, over <br />the Deer Trail Ditch and under the Fire Mountain Canal. <br />r 1 <br />L J <br />(i) General Drainage Plan <br />(i)(A) Sediment ponds B, C, J, K, and F and the general drainage plan for the main site, <br />loadout and new gob pile were prepared underthe direction of J. E. Stover, Colorado <br />Professional Engineer, No. 19230. Sediment pond D and the general drainage plan <br />for the gob pile were prepared under the direction of Allan J. Breitenbach, Colorado <br />Professional Engineer, No. 15247. <br />(i)(B) A description of the ponds is presented above. Detail drawings of ponds B, C, J, K, <br />and F are presented on Map Nos. 22 -B, 22 -C, 22 -J, 22 -K, and Volume IX Figure 3 <br />respectively. A detailed drawing of the gob pile sediment pond is presented in <br />Volume 4, drawing 95266 -04. <br />(i)(C) The preliminary hydrologic and geologic information required to assess the <br />hydrologic impact of the structure is presented in Volume III, Exhibit 8 for ponds B, <br />C, J, and K, Volume IV, Appendices A and B br the refuse pile pond and Volume <br />IX, Appendix B, for Pond F. <br />(i)(D) No underground mining has occurred under any of the sediment ponds and none is <br />anticipated. <br />(i)(E) Not applicable. <br />(ii) Detailed Design Plans <br />(ii)(A) Sediment ponds B, C, J, K, and F and the drainage plan for the main site, loadout <br />and new gob pile were prepared under the direction of J. E. Stover, Colorado <br />Professional Engineer, No. 19230. Sediment pond D and the drainage plan for the <br />gob pile were prepared under the direction of Allan J. Breitenbach, Colorado <br />Professional Engineer, No. 15247. <br />TR -47 <br />2.05-30- <br />07/07 <br />APPROVED <br />