Laserfiche WebLink
Truck/Loader Team Work cont'd Task # : 026 sheet 2 of 2 <br />r ^' <br />_ 24 ...s..." ' .....a.: <br />Loadina Tool Cycle Time: Number of loading tool passes required to fill truck : 3 passes <br />Excavators and front shovels - machine cycle time vs. job condition rating : NA <br />- selected value within basic rating :_ NA <br />Track loaders -material descr.: <br />- cycle time elements (min.) : Load : NA Maneuver: NA Dump: 0.100 <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and dumf 0.550 minutes <br />Cycle Time Factors <br />Loading Condition Description <br />Factor (min.) <br />Source <br />Material : <br />Mixed material <br />0.020 <br />(Cat HB) <br />Stockpile <br />Dumped by truck <br />0.020 <br />(Cat HB) <br />Truck ownership : <br />Common ownership of trucks and loaders <br />-0.040 <br />(Cat HB) <br />Operation : <br />Constant operation <br />-0.040 <br />(Cat HB) <br />Dump target : <br />Small target <br />0.040 <br />(Cat HB) <br />Road <br />segment# <br />Net cycle time adjustment: <br />U.000 <br />minutes <br />Total <br />I resistance ( %) <br />Adjusted loader cycle time (total time per loader pass) : <br />0.550 <br />minutes <br />9 <br />Net load time per truck * : <br />1.650 <br />minutes <br />Truck Cycle Time: <br />bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />101.73 <br />Truck exchange time * *: <br />0.00 minutes........ Adjusted for site altitude : <br />0.000 <br />minutes <br />Truck load time: <br />1.650 minutes........ Adjusted for site altitude : <br />1.650 <br />minutes <br />Truck maneuver and dump time: <br />0.90 minutes........ Adjusted for site altitude : <br />0.900 <br />minutes <br />**set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1st loader cycle) <br />_.2 ,...,.'3...,._; <br />Truck travel (haul & return) time: <br />Road condition NA-user <br />JOB TIME AND COST <br />Haul route : <br />Fleet size : <br />1 Team(s) Total job time : <br />Road <br />segment# <br />Haul distance <br />(miles) <br />Grade <br />res. ( %) <br />Rolling <br />res. ( %) <br />Total <br />I resistance ( %) <br />Speed <br />(miles/hour) <br />Travel time <br />(minutes) <br />1 <br />9 <br />NA -user <br />NA -user <br />NA -user <br />30 <br />18.000 <br />101.73 <br />LCY /hr <br />Adjusted hourly single truck /loader team production : <br />101.73 <br />LCY /hr <br />Adjusted hourly multiple truck/loader team production : <br />101.73 <br />LCY /hr <br />_.2 ,...,.'3...,._; <br />JOB TIME AND COST <br />Fleet size : <br />1 Team(s) Total job time : <br />33.18 <br />Hours <br />Unit cost: <br />$7.974 /LCY Total job cost : <br />$26,913 <br />Return route : Haul time ** : 18.000 minutes <br />minutes <br />minutes <br />Loading tool unit production : <br />357.95 LCY /hour...... Adjusted for job efficiency : <br />297.10 <br />LCY /hour <br />Truck unit production : <br />15.32 LCY /hour...... Adjusted for job efficiency : <br />12.72 <br />LCY /hour <br />Optimal no. trucks /loading tool : <br />23 trucks........... Selected no. trucks /loader : <br />8 <br />trucks <br />Adjusted hourly truck team production : <br />101.73 <br />LCY /hr <br />Adjusted hourly single truck /loader team production : <br />101.73 <br />LCY /hr <br />Adjusted hourly multiple truck/loader team production : <br />101.73 <br />LCY /hr <br />_.2 ,...,.'3...,._; <br />JOB TIME AND COST <br />Fleet size : <br />1 Team(s) Total job time : <br />33.18 <br />Hours <br />Unit cost: <br />$7.974 /LCY Total job cost : <br />$26,913 <br />" travel time shown for each segment includes acceleration /deceleration adjustment Return time * *: 18.000 <br />" total haul and return time shown includes altitude adjustment Total truck cycle time : 38.550 <br />