My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-09_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-09_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:39 PM
Creation date
6/9/2010 4:33:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/9/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR118 (MT3)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-- �- - - -_ - - � �- sheet 1 of t <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name Colorado Division Of Reclamation, Mining And Safety <br />Task # : 027 State : Colorado Permit/job # : C- 1996 -083 <br />Date : 1110212009 County : Delta Abbreviation : none <br />User : JRS Site Bowie No. 2 Mine Filename :C083 -027 <br />Permit or other job action : 2009 Midterm Review <br />Task description Haul Rock to Vent Shafts for Disposal <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />�Fouinment Description <br />Truck/loader team -Truck <br />-Loader: <br />Generic 10 -12 cy, 6x4 <br />CAT 95OG (2002) <br />Support equipment -Load area :NA <br />-Dump area: <br />Rated capacity (nom. heaped) : 3.750 LCY <br />NA <br />Road maintenance -Motor grader: <br />-Water truck : <br />NA <br />NA <br />Cost Breakdown: <br />Truck/Loader Work Team <br />Truck Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : <br />truck2 <br />loader <br />NA <br />NA <br />NA <br />NA <br />% Utilization-machine: <br />99 <br />100 <br />NA <br />NA <br />NA <br />NA _ <br />- Ripper attachment: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$13.34 <br />$22.80 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour : <br />$38.51 <br />$27.63 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour : <br />$22.29 <br />$38.54 <br />NA <br />NA <br />NA <br />NA <br />Unit subtotals : <br />Number of units : <br />$74.14 <br />$88.96 <br />NA <br />NA <br />NA <br />NA <br />4 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group subtotals :1 <br />Work : $385.52 <br />Support : $0.00 <br />Maintenance : $0.00 <br />Total work team cost/hour: $385.52 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 2,000 LCY factor : NA volume: 2,000 LCY <br />Material weight <br />Descr.: Traprock - broken <br />Rated payload <br />Payload capacity <br />2,950 pounds /LCY Struck volume : <br />Heaped volume: <br />35,400 pounds Average volume: <br />12.00 LCY Adjusted volume *: <br />Final truck volume based on number of loader passes <br />truck volume adjusted to not exceed rated payload or heaped volume <br />10.00 <br />12.00 <br />11.00 <br />12.00 <br />11.25 <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />Loading Tool Capacity: <br />Job Condition Corrections : <br />Site altitude (ft.) : <br />7,100 <br />Rated capacity (nom. heaped) : 3.750 LCY <br />Truck <br />Loader <br />Source <br />Descr.: USER - PROVIDED BUCKET FILL FACTOR <br />Altitude adj.: 1.000 <br />1.000 <br />(Cat HB <br />Bucket fill factor: 0.500 <br />Job efficiency: <br />0.830 <br />0.830 <br />(1 shif1da, <br />Net correction : <br />0.830 <br />0.830 <br />Adjusted bucket capacity : 1.875 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.