Demolition Work
<br />Page 1 of 2
<br />Protect Identification
<br />Agency or organization name: Colorado Division of Minerals and Geology
<br />Task #: 3 Permitljob#: C2009 -87
<br />Date: 412912010 Abbreviation:
<br />User: jhb Filename: C:1jhb1TEAM1Peabody Sage Creek Mine1RCE1C2009 -087
<br />Permitting action: New Application Source of unit costs: 2010 RS Means
<br />Task description: Demolish structures at North facilites, remove materials and debris
<br />STRUCTURE or ITEM DESCRIPTION
<br />CIRCES DEMOLITION MENU SELECTION
<br />(Dimensions in ft or cf unless noted)
<br />Dimensions from text & Map 2.05.3 -M1A
<br />1. parking lot gravel (truck/loader task)
<br />office area, Parts storage, Maint. Area, east of boneyard parking
<br />2. Security building
<br />12 x 40 X 10 Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha
<br />concrete floor
<br />15 x 45 X 0.3 Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul
<br />3. a) Bathhouse
<br />42 x 40 x 10.0 Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha
<br />b) bathhouse floor slab
<br />42 X 40 X 0.3 Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul
<br />c) bathhouse footers
<br />84 76 Demo. and on -site disposal in existing pit, 1.5 ft. x 2 ft. - Max. 10,000 ft. h
<br />4. a) Diesel Tank 20,000 gal
<br />20K Haul tank to certified salvage dump - 9,000 to 12,000 gal. Tank
<br />assume 5% sludge clean out
<br />1000 Remove sludge, water, and rem. product from tank - 9,000 to 12,000 gal.
<br />Dry ice for inert transport
<br />20K Insert dry ice (CO2) into tank to produce inert gas - 1.5 Ibs. /100 gal.
<br />b) Unleaded fuel tank
<br />2000 Haul tank to certified salvage dump - 3,000 to 5,000 gal. Tank
<br />assume 5% sludge clean out
<br />100 Remove sludge, water, and rem. product from tank - 3,000 to 5,000 gal.
<br />Dry ice for inert transport
<br />2000 Insert dry ice (CO2) into tank to produce inert gas -1.5 Ibs.1100 gal.
<br />c) Mag chloride tank
<br />2500 Haul tank to certified salvage dump - 3,000 to 5,000 gal. Tank
<br />d) Used oil tanks (3)
<br />3.0 X 2000 Haul tank to certified salvage dump - 3,000 to 5,000 gal. Tank
<br />assume 5% sludge cleanout
<br />3.0 x 100 Remove sludge, water, and rem. product from tank - 3,000 to 5,000 gal.
<br />Dry ice for inert transport
<br />3.0 x 2000 Insert dry ice (CO2) into tank to produce inert gas -1.5 Ibs./100 gal.
<br />e) tank pads
<br />120 Slab on grade, concrete, demolition only - Mesh reinforcing
<br />push 120cy broken concrete to pit
<br />1,175
<br />5. Electrical Substation slabs
<br />12 x 30 X 1.0 Demo. and on -site disposal in existing pit, 4 in. thick - Max. 10,000 ft. haL
<br />a) Poweriines
<br />5 miles Seneca II SL3 estimate 3/2009
<br />4 8" cased boreholes 250ft. deep
<br />Cost BOREHOLES as Borehole task
<br />6. a) Water storage Tank 1 OK
<br />10K Haul tank to certified salvage dump - 9,000 to 12,000 gal. Tank
<br />b) water tank foundation
<br />50 x 50 x 1.0 Demo. and on -site disposal in existing pit, 8 in. thick - Max. 10,000 ft. haL
<br />c) Well & Pumphouse
<br />10 x 10 x 8.0 Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha
<br />7. a) Septic Tank 100,000 gal
<br />2010 R.S.Means 02 41 13.44 1100
<br />b) Lift Station
<br />10 x 10 x 10.0 Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha
<br />Last unit cost update: 2010
<br />QUANTITY UNIT UNIT COST TOTAL COST
<br />page subtotal= 150,313
<br />If
<br />$
<br />-
<br />4,800
<br />Cf
<br />$
<br />0.27
<br />$
<br />1,296
<br />203
<br />sf
<br />$5.80
<br />$
<br />1,175
<br />1
<br />$
<br />-
<br />$
<br />-
<br />16,800
<br />Cf
<br />$
<br />0.27
<br />$
<br />4,536
<br />1,680
<br />sf
<br />$
<br />3.13
<br />$
<br />5,258
<br />160
<br />If
<br />$13.30
<br />$
<br />2,128
<br />1
<br />$
<br />-
<br />2
<br />ea
<br />$1,000.00
<br />$
<br />2,000
<br />2
<br />ea
<br />$369.00
<br />$
<br />738
<br />300
<br />Ibs
<br />$
<br />2.25
<br />$
<br />675
<br />1
<br />ea
<br />$700.00
<br />$
<br />700
<br />1
<br />ea
<br />$221.00
<br />$
<br />221
<br />30
<br />Ibs
<br />$2.25
<br />$
<br />68
<br />1
<br />ea
<br />$
<br />700.00
<br />$
<br />700
<br />3
<br />ea
<br />$
<br />700.00
<br />$
<br />2,100
<br />3
<br />ea
<br />$221.00
<br />$
<br />663
<br />90
<br />Ibs
<br />$2.25
<br />$
<br />203
<br />120
<br />cy
<br />$
<br />123.85
<br />$
<br />14,862
<br />1
<br />$
<br />-
<br />$
<br />-
<br />1
<br />$
<br />-
<br />$
<br />360
<br />sf
<br />$
<br />3.13
<br />$
<br />1,127
<br />26,400
<br />If
<br />$2.77
<br />$
<br />73,128
<br />1
<br />$
<br />-
<br />1
<br />ea.
<br />$
<br />1,000.00
<br />$
<br />1,000
<br />2,500
<br />$
<br />2.38
<br />$
<br />5,950
<br />800
<br />Cf
<br />$0.27
<br />$
<br />216
<br />1
<br />$
<br />-
<br />1
<br />ea.
<br />$31,300.00
<br />$
<br />31,300
<br />1,000
<br />Cf
<br />$
<br />0.27
<br />$
<br />270
<br />page subtotal= 150,313