Laserfiche WebLink
Protect Identification <br />Task #: 3 <br />Date: 412912010 <br />User: jhb <br />Permitting action: New Application <br />Task description: Demolish structures at North facilites, remove materials and debris <br />STRUCTURE or ITEM DESCRIPTION <br />(Dimensions in ft or cf unless noted) <br />8. Covered storage Buildings <br />two buildings 150 x 50 x 20.0 <br />two buildings 100 X 30 x 20.0 <br />footers for 4 storage bldgs. 500 320 <br />9. Office 10 x <br />dimensions from Seneca 11 Mine SL3 est. <br />Office floor <br />50 x <br />office parking lot - gravel <br />Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul <br />10. Security building & gate <br />12 x <br />Map 2.05.3 M1 B <br />Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul <br />Office slab 4" thick <br />15 x <br />11. Electrical parts building <br />30 x <br />Elec. Parts bldg. floor <br />30 x <br />12. Lean -to (SII SL3 est.) <br />100 x <br />13. Parts Building (SII SL3 est.) <br />110 x <br />Parts bldg. floor <br />110 x <br />14. Vehicle Maintenance Shop <br />140 x <br />Map 2.05.3 M1 B & SII SL3 est. <br />Demo. and on -site disposal in existing pit, 1.0 ft. x 2 ft. - Max. 10,000 ft. h <br />VMS floor <br />140 x <br />15. Welding Shop <br />90 x <br />Welding shop floor <br />90 x <br />Foundation <br />292 x <br />16. Maintenance shop <br />120 x <br />Maint. Shop floor <br />120 x <br />foundation <br />324 x <br />17. concrete disposal on site: Add $7.77/CY on site <br />60 X 50 <br />60 x 1 <br />Page 2 of 2 <br />Agency or organization name: Colorado Division of Minerals and Geology <br />Permit/job#: C2009 -87 <br />Abbreviation: <br />Filename: C:\jhb1TEAM1Peabody Sage Creek Mine1RCE1C2009 -087 <br />Source of unit costs: 2010 RS Means <br />CIRCES DEMOLITION MENU SELECTION <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha <br />Demo. and on -site disposal in existing pit, 1.0 ft. x 2 ft. - Max. 10,000 ft. h <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha <br />Demo. and on -site disposal in existing pit, 4 in. thick - Max. 10,000 ft. hay <br />40 x 10 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha <br />45 1 <br />Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul <br />22 x 10 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha <br />22 x 1 <br />Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul <br />12 x 10 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha <br />70 x 20 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha <br />70 x 1 <br />Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul <br />80 x 20 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha <br />80 x 1 <br />Demo. and on -site disposal in existing pit 6 in. thick - Max. 10,000 ft. haul <br />56 x 15 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha <br />56 x 1 <br />Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul <br />1 x 1 <br />Demo. and on -site disposal in existing pit, 1.0 ft. x 2 ft. - Max. 10,000 ft. h <br />42 x 15 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha <br />42 x 1 <br />Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul <br />1 x 1 <br />Demo. and on -site disposal in existing pit, 1.0 ft. x 2 ft. - Max. 10,000 ft. h <br />cost adusted for location: =total direct cost' 105.7% = <br />Last unit cost update: <br />2010 <br />QUANTITY <br />UNIT <br />UNIT COST <br />TOTAL COST <br />1 <br />$ <br />300,000 <br />cf <br />$ <br />0.27 <br />$ 81,000 <br />120,000 <br />Cf <br />$ <br />0.27 <br />$ 32,400 <br />820 <br />If <br />$11.09 <br />$ 9,094 <br />30,000 <br />Cf <br />$ <br />0.27 <br />$8,100.00 <br />3,000 <br />sf <br />$ <br />3.13 <br />$9,390.00 <br />4,800 <br />Cf <br />$0.27 <br />$1,296.00 <br />675 <br />sf <br />$ <br />3.13 <br />$2,112.75 <br />6,600 <br />cf <br />$0.27 <br />$1,782.00 <br />660 <br />sf <br />$ <br />3.13 <br />$2,065.80 <br />12,000 <br />Cf <br />$ <br />0.27 <br />$3,240.00 <br />154,000 <br />Cf <br />$ <br />0.270 <br />$41,580.00 <br />7,700 <br />sf <br />$ <br />3.13 <br />$24,101.00 <br />224,000 <br />Cf <br />$ <br />0.27 <br />$60,480.00 <br />11,200 <br />sf <br />$ <br />4.170 <br />$46,704.00 <br />75,600 <br />Cf <br />$ <br />0.27 <br />$20,412.00 <br />5,040 <br />sf <br />$ <br />3.130 <br />$15,775.20 <br />292 <br />If <br />$ <br />11.090 <br />$3,238.28 <br />75,600 <br />Cf <br />$0.27 <br />$20,412.00 <br />5,040 <br />sf <br />$ <br />3.130 <br />$15,775.20 <br />324 <br />If <br />$11.09 <br />$3,593.16 <br />page subtotal = <br />$5,126.75 <br />Direct cost total= <br />$557,990.64 <br />$ 589,796.11 <br />Total with CCI= <br />$589,796.11 <br />