My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-21_REVISION - C1981010 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2010-05-21_REVISION - C1981010 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:14 PM
Creation date
5/24/2010 8:41:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
5/21/2010
Doc Name
2010 Midterm Review Cost Estimate (Memo)
From
Jason Musick
To
Rob Zuber
Type & Sequence
MT6
Email Name
JDM
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cwt of bulk cement <br />Rig wl crew <br />2,500 gal Water <br />Octoplug Cut surface <br /> <br />Hole <br />Total <br />Hole (assuming 94 Ibs of <br />Cement cost <br />Total rig <br />hourly rate <br />water truck truck wl <br />(Circes, <br />casing & <br />Hole diam. de th <br />p volume cement per 1.18 cf of <br />per cwt Cement Rig setup time Rig time to <br />t <br />ime (setup <br />(2010 Circes, Total <br />w/driver driver cost <br />$19.57 <br />mark <br />Total cost <br /> <br />(in) <br />(ft) <br />(cf) hole, that is 1001bs <br />(CIRCES) total cost per hole (hr) fill hole <br />+ fill) <br />Reed drill, rig cost <br />hourly rate (rig fill <br />per in. <br />(Circes, <br /> of cement fills 1.25 7,0") (Circes) time x diam.) $10.9011f) <br /> cf) <br />truck <br />rate) <br />GP9 4 202 18 14 $9.20 $130 1.16833333 0.18 1.34 $224.93 $302 $60 $11 $78 $25 $546 <br />11 4 30 3 2 $9,20 $19 0.42 0.50 0.92 $224.93 $207 $60 $30 $78 $25 $359 <br />P1 4 21 2 1 $9.20 $13 0.42 0.50 0.92 $224.93 $207 $60 $30 $78 $25 $354 <br />P2 4 21 2 1 $9.20 $13 0.42 0.50 0.92 $224.93 $207 $60 $30 $78 $25 $354 <br />P3 4 35 3 2 $9.20 $22 0.42 0.50 0.92 $224.93 $207 $60 $30 $78 $25 $363 <br />P4 4 12 1 1 $9,20 $8 0.42 0.50 0.92 $224.93 $207 $60 $30 $78 $25 $348 <br />P5 4 21 2 1 $9.20 $13 0.42 0.50 0.92 $224.93 $207 $60 $30 $78 $25 $354 <br />P6 4 51 4 4 $9.20 $33 0.67 0.50 1.17 $224.93 $263 $60 $30 $78 $25 $429 <br />P7 4 37 3 3 $9,20 $24 0.42 0.50 0.92 $224.93 $207 $60 $30 $78 $25 $364 <br />P8 4 33 3 2 $9,20 $21 0.42 0.50 0.92 $224.93 $207 $60 $30 $78 $25 $361 <br />GF1 4.25 220 22 17 $9.20 $159 1.18333333 0.22 1.40 $224.93 $315 $60 $13 $83 $25 $596 <br />GF5 4.25 153.5 15 12 $9.20 $111 1.12791667 0.15 1.28 $224.93 $288 $60 $9 $83 $25 $516 <br />GF7 4.25 127 13 10 $9.20 $92 1.10583333 0.13 1.23 $224.93 $277 $60 $8 $83 $25 $485 <br />Lux-1 5 180.6 25 20 $9.20 $181 1.1505 0.25 1.40 $224.93 $314 $60 $15 $98 $25 $633 <br />GB3 6 290 57 46 $9.20 $419 1.24166667 0.57 1.81 $224.93 $407 $60 $34 $117 $25 $1,003 <br />GD1 6 1132 222 178 $9.20 $1,636 1.94333333 2.22 4.17 $224.93 $937 $60 $133 $117 $25 $2,848 <br />GD1(2) 6 1144 225 180 $9.20 $1,653 1.95333333 2.25 4.20 $224.93 $945 $60 $135 $117 $25 $2,875 <br />TOTAL $31,003 <br />TASK 123 <br />Station 1 6 200 39 31 $9.20 $289 1.16666667 0.39 1.56 $224.93 $351 $60 $24 $117 $25 $806 <br />Station 2 6 200 39 31 $9.20 $289 1.16666667 0.39 1.56 $224.93 $351 $60 $24 $117 $25 $806 <br />Station 3 6 200 39 31 $9.20 $289 1.16666667 0.39 1.56 $224.93 $351 $60 $24 $117 $25 $806 <br />Station 4 6 200 39 31 $9.20 $289 1.16666667 0.39 1.56 $224.93 $351 $60 $24 $117 $25 $806 <br />TOTAL $3,224 <br /> Total hours 23.59 Grand total $101,556 <br /> Divided by number of rigs 1 <br /> Net total hours 23.59
The URL can be used to link to this page
Your browser does not support the video tag.