Laserfiche WebLink
Demolition Work <br />Project Identification - - <br /> Agency or organization name: Division of Reclamation Mining and Safety <br />Task 111: 130 Permit/job#: C1981-010 <br />Date: 31412010 Abbreviation: N/A <br />User: JDM Filename: c:\jdm\estimate\trapper\2010Midterm\130 <br />Permitting action: MT 10 Source of unit costs: CIRCES <br />Task description: Demolish structures, remove materials and debris location adjustment 92.32% <br /> Last unit cost update: 2007 <br />STRUCTURE or ITEM DESCRIPTION CIRCES DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />(Dimensions in ft or cf unless noted) <br />1. Main office x X Bldg. demo. and on-sits disposal in existing pit or cut - Max. 10,000 ft. h 317,548 CF $ 0.223 $70,813.20 <br />2. Office bldg. floor Demo. and on-site disposal in existing pit 10 in. thick - Max. 10,000 it Its 15,288 SF $ 2.85 $ 43,571 <br />3. reinforced concrete floor office bldg. Demo. and on-site disposal in existing pit 12 in. thick - Max. 10,000 ft. h. 251 SF $ 3.42 $ 858 <br />4. footers Demo. and on-site disposal in existing pit, 1.5 ft. x 2 ft. - Max. 10,000 ft. 804 LF $10.25 $ 8,241 <br />5. remove fencing Fencing, chain link, including posts and fabric - 8 ft. to 10 ft. high 500 LF $2.46 $ 1,230 <br />6. Shop\Warehouse Bldg. demo. and on-sits disposal in existing pit or cut - Max. 10,000 ft. It 1,925,700 CF $0.22 $ 429,431 <br />7.Warehouse concrete floor Demo. and on-site disposal in existing pit 12 in. thick - Max. 10,000 ft. h 92,700 SF $ 3.42 $ 317,034 <br />8. Warehouse 4' th. Concrete floor Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. hat 7,925 SF $ 1.14 $ 9,035 <br />9. Warehouse footers Demo. and on-site disposal in existing pit, 1.5 ft. x 2 ft. - Max. 10,000 ft. 1,822 LF $10.25 $ 18,676 <br />10. remove fencing Fencing, chain link, including posts and fabric - 8 ft. to 10 ft. high 500 LF $2.46 $ 1,230 <br />1 0.a. Silver storage trailer 40'1 X 10'h x 10'w Bldg. demo. and on-sits disposal in existing pit or cut - Max. 10,000 ft. h 4,000 CF $0.22 $ 892 <br />10.b. Ble caterpillar parts trailer 35'1 x 10'w, x 8'h Bldg. demo. and on-sits disposal in existing pit or cut - Max. 10,000 ft. h 2800 CF 0.223 $ 624 <br />11. Wash/ Lube Bay Bldg. demo. and on-sits disposal in existing pit or cut - Max. 10,000 ft. h 173,500 CF $ 0.22 $ 38,691 <br />12. Wash bay concrete floor Demo. and on-site disposal in existing pit 6 in. thick - Max. 10.000 ft. he 9,275 SF $ 1.71 $ 15,860 <br />13. Wash bay footers Demo. and on-site disposal in existing pit, 1.0 ft. x 2 ft. - Max. 10,000 ft. 480 LF $6.83 $ 3,278 <br />14. Carpertefs shop Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. h 24,000 CF $ 0.198 $ 4,752 <br />15. Shop concrete floor Demo. and on-site disposal in existing pit 6 in. thick - Max. 10,000 ft. he 2,400 SF $ 1.71 $ 4,104 <br />16. shop footers Demo. and on-site disposal in existing pit, 1.0 ft. x 2 ft. - Max. 10,000 ft. 290 LF $6.83 $ 1,981 <br />16.a. Seed trailer 30'1 X 10'W. x 8'h Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. h 2,400 CF $ 0.198 $ 475 <br />17. Pump House Bldg. demo. and on-site disposal in excavated pit - Max. 10,000 ft. haul 4,840 CF $0.24 $ 1,152 <br />18. pump house floor Demo. and on-site disposal in existing pit 6 in. thick - Max. 10,000 ft. he 484 SF $ 1.71 $ 828 <br />19. Pump house footers Demo. and on-site disposal in existing pit. 1.0 ft. x 2 ft. - Max. 10,000 ft. 88 LF $6.83 $ 601 <br />19.a. Old cars and equipment at water Tanks 120'1 x 10'w x 4'h Bldg. demo. and on-site disposal in existing pit or cut - Max. 10.000 ft. h 4,800 CF $ 0.22 $ 1,070 <br />20. Light Duty & Electrical Shop Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. h 94,500 CF $ 0.223 $ 21,074 <br />21, concrete floor Demo. and on-site disposal in existing pit 6 in. thick - Max. 10,000 ft. he 5,250 SF $ 1.71 $ 8,978 <br />22. footers Demo. and on-site disposal in existing pit, 1.0 ft. x 2 ft. - Max. 10,000 ft. 348 LF $6.83 $ 2,377 <br /> <br />23. Break up and bury parking lot asphalt 22028 SF Pavement. bituminous, demolition only- 4 in. to 6 in. thick 2,448 SY $ 5.25 $ 12,850 <br /> <br />24. Storage Tank removal & disposal $ - <br />Water Tank 80,000 gallon Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. h 10,667 CF $ 0.22 $ 2,379 <br />Water Tank 80,000 gallon Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. It 10,667 CF $0.22 $ 2,379 <br />Diesel Tank 100,000 gallon Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. h 13,333 CF $0.22 $ 2,973 <br />Deisel Tank 100,000 gallon Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. h 13,333 Cf $ 0.22 $ 2,973 <br />Deisel Tank 20,000 gallon Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. h 2,667 CF $0.22 $ 595 <br />Deisel Tank 20,000 gallon Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. It 2,667 CF $ 0.22 $ 595 <br />Deisel Tank 20,000 gallon Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. It 2,667 CF $ 0.22 $ 595 <br />Deisel Tank- removed but onsite 20,000 gallon Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. h 2,667 CF $0.22 $ 595 <br />Deisel Tank-removed but onsite 20,000 gallon Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. h 2,667 CF $ 0.22 $ 595 <br />Gasoline Tank 15,000 gallon Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. It 2,000 CF $ 0.22 $ 446 <br />Concrete pads for storage tanks 6500 SF Demo. and on-site disposal in existing pit 6 in. thick - Max. 10,000 ft. he 6,500 SF $ 1.71 $ 11,115 <br />Fuel tank sludge removal -7 tanks 6,300 gallons Remove sludge, water, and rem. product from tank - 6,000 to 8,000 gal. 1 EA $268.00 $ 268 <br />Disposal of Tank sludge 26 Tons Dispose of tank sludge off-site - Average 6,300 gal $ 6.60 $ 41,580 <br />25. Powedines 75,330 lin. Ft. Powedine or telephone line, overhead, wood - Single pole 75,330 LF $2.77 $ 208,664 <br />Miscellaneous structures $ - <br />26. Tire shed-skid mounted 6000 cu.ft. Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. It 6,000 CF $ 0.22 $ 1,338 <br />27. Main substation 6000 cuff Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. It 6,000 CF $0.22 $ 1,338 <br />28. concrete pads 1200 sq. ft. Demo. and on-site disposal in existing pit 6 in. thick - Max. 10,000 ft. he 1,200 SF $ 1.71 $ 2,052 <br />29. 4 portables 4200 cu.ft. Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. It 4,200 CF $0.22 $ 937 <br />30. ANFO Silos and Emulsion Tank 10940 cu.ft. Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. It 10,940 CF $ 0.19 $ 2,035 <br />30.a. New (2007) emulsion tank 15,000 gal Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. h 1,600 CF $ 0.22 $ 357 <br />31. Concrete Pad 1642 sq.ft. Demo. and on-site disposal in existing pit 6 in. thick - Max. 10,000 ft. he 1,642 SF $ 1.71 $ 2,808 <br />32. Footers 52 LF Demo. and on-site disposal in existing pit, 1.0 ft. x 2 ft. - Max. 10,000 ft. 52 LF $6.83 $ 355 <br />33. Explosives storage-2 magazines 2 X 853.3 cf Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. It 1,707 CF $0.22 $ 381 <br />34. Explosives storage trailer 2560 cf Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. It 2,560 CF $0.22 $ 571 <br />34.x.2 large expl. Magazines 2 x 22.51 x 8' X 6' Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. It 2,160 CF $0.22 $ 482 <br />35. Pole building-removed 2004 $ - <br />36. old expl. Area fencing-removed 2004 $ - <br />37. Baby Doe tub pad (MR202) 701 x 70'w x 0.67'th Demo. and on-site disposal in existing pit, 8 in. thick - Max. 10,000 ft. he 4,900 SF $ 2.28 $ 11,172 <br />38. Tub pad railroad track 2 X 3121 Railroad track - Ties and track 624 LF $8.23 $ 5,136 <br />38.a 5 cargo containers 5 x 251 x 8'K 8' Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. h 8,000 CF $ 0.22 $ 1,784 <br /> Sheet subtotal(unadjusted for location) $1 ,326,199.39 <br /> Sheet subtotal cost (adjusted for location) $ 1,224,347