Laserfiche WebLink
language, as shown below along with the original language as issued RN-01 for <br />reference (in brackets). All other stipulations have been resolved or complied with. <br />Stipulation No. 20 <br />PERMIT RENEWAL NO. 2 (RN-02) IS A RENEWAL OF THE PERMIT AS A <br />RECLAMATION ONLY PERMIT. IN THE EVENT THAT THE L.ORENCITO CANYON <br />OPERATION IS PLANNED TO REOPEN FOR COAL MINING AND REMOVAL, THE <br />OPERATOR SHALL SUBMIT A PERMIT REVISION, RECEIVE APPROVAL FOR, AND <br />SUBMIT ANY INCREASE IN RECLAMATION BOND, PRIOR TO ANY ADDITIONAL <br />DISTURBANCE OF LANDS WITHIN THE PERMIT AREA. <br />[OLD: THE PERMIT RENEWAL NO. 1 (RN-01) IS APPROVED AS A RECLAMATION <br />ONLY PERMIT. IN THE EVENT THAT THE LORENCITO CANYON OPERATION IS <br />PLANNED TO REOPEN FOR COAL MINING AND REMOVAL, THE OPERATOR <br />SHALL SUBMIT A PERMIT REVISION, RECEIVE APPROVAL FOR, AND SUBMIT <br />ANY INCREASE IN RECLAMATION BOND, PRIOR TO ANY ADDITIONAL <br />DISTURBANCE OF LANDS WITHIN THE PERMIT AREA.] <br />Section IV - Enforcement Actions <br />No enforcement actions are currently pending at this site and the mine is in compliance <br />with the Rules and Regulations. No violations have been issued since Permit Renewal <br />No. 2 (RN-02) in September 2008. <br />Section V - Summary and Discussion <br />Please review the questions below and submit a technical revision to the permit within <br />45 days of receipt of this mid-term review to address the identified deficiencies. <br />Table 2.04.7-5 lists the water rights leased by New Elk Coal Company. <br />Please update this table, if necessary, with current information. Please also <br />correct the date for Tafoya and Virgil, listed as 22/2/1'2866. <br />2. The Table of Contents identifies Map 2.04.9-1 Soils but the map in the <br />approved permit is "Soils - Jeff Canyon Surface Mine 5-year Mine Plan, <br />Map 2.04.9-2 (RN-01) 11/2003". Please correct this discrepancy. <br />3. Page 2.05-11 says "spoil transportation zones are shown on Map 2.05.3-1" <br />but no zones appear to be shown. Please correct this discrepancy. <br />4. Figure EX 15-15 Surface Mines Surface Water Management Plan depicts <br />the surface runoff system for the site. While some of this information may <br />be correct, many ditches are not shown as compared to Map 2.05.4-2 Post <br />mining Topography 2006. Should Figure EX 15-15 be referenced as historic <br />and should some of the ditch labeling be transferred to Map 2.05.4-2 to