My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-09_REVISION - M2008078 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2010-04-09_REVISION - M2008078 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:30 PM
Creation date
4/12/2010 11:00:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
REVISION
Doc Date
4/9/2010
Doc Name
Submittal
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. GP Ranches LLC <br />West Farm Pit <br />(Reclamation Bond Quantities and Costs <br />07115 GP Ranches Rec Bond Calm TRII <br />Phase 8 (9.59 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mininci Area <br />Liner Required to Close Phase 5 (Credit) - Shell (158,514) cyd $ 2.25 $ (356,656) <br />Liner Required to Close Phase 5 (Credit) - Core (56,310) c, yd $ 3.25 $ (183,007) <br />Permanent liner - Shell 93,779 cyd $ 2.25 $ 211,004 <br />Permanent liner - Core 33,314 cyd $ 3.25 $ 108,270 <br />Liner Required to Close Phase 8 - Shell 253,812 cyd $ 2.25 $ 571,077 <br />Liner Required to Close Phase 8 - Core 90,163 cyd $ 3.25 $ 293,031 <br />Topsoil Area Above Water 2.5 Etc $ 2,000 $ 5,044 <br />Revegetate Area Above Water 2.5 Etc $ 1,000 $ 2,522 <br />Dewatering of Full Pit 147.6 Mil. Gal. $ 350.00 $ 51,663 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Di rect Cost $ 1,245,111 <br />Overhead and Profit Cost (12.60%) $ 156,884 <br />Contract Cost 1,401,995 <br />Project Management (9.25%) $ 115,173 <br />Additional Financial Warranty Required For Phase 8 $ 1,517,168 <br />Phase 9 (9.60 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Liner Required to Close Phases 8,6 (Credit) - Shell (254,571) cyd $ 2.25 $ (572,786) <br />Liner Required to Close Phases 8,6 (Credit) - Core (90,433) cyd $ 3.25 $ (293,907) <br />Liner Required to Close Phase 9 - Shell 233,751 cyd $ 2.25 $ 525,940 <br />Liner Required to Close Phase 9 - Core 86,619 cyd $ 3.25 $ 281,511 <br />Topsoil Area Above Water 1.8 cyd $ 2.25 $ 4 <br />Revegetate Area Above Water 1.8 cyd $ 3.25 $ 6 <br />Dewatering of Full Pit 160.2 Mil. Gal. $ 350.00 $ 56,057 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br />Total Direct Cost $ (675) <br />Overhead and Profit Cost (12.60%) $ (85) <br />Contract Cost $ (760) <br />Project Management (9.25%) $ (62) <br />Additional Financial Warranty Required For Phase 9 $ (822) <br />6of11
The URL can be used to link to this page
Your browser does not support the video tag.