Laserfiche WebLink
J&T Consulting, Inc. GP Ranches LLC <br />West Farm Pit <br />4/8/2010 <br />Bond Quantities and Costs <br />07115 GP Ranches Rec Bond Calcs <br />Phas® 10 (9.50 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Liner Required to Close Phases 7,9 (Credit) - Shell (231,485) c, yd $ 2.25 $ (520,842) <br />Liner Required to Close Phases 7,9 (Credit) - Core (85,779) c, yd $ 3.25 $ (278,782) <br />Permanent liner - Shell 86,110 cyd $ 2.25 $ 193,747 <br />Permanent liner- Core 31,909 cyd $ 3.25 $ 103,703 <br />Liner Required to Close Phase 10 - Shell 146,944 cyd $ 2.25 $ 330,625 <br />Liner Required to Close Phase 10 - Core 54,452 cyd $ 3.25 $ 176,968 <br />Topsoil Area Above Water 1.8 ac $ 2,000 $ 3,683 <br />Revegetate Area Above Water 1.8 ac $ 1,000 $ 1,842 <br />Dewatering of Full Pit 158.5 Mil. Gal. $ 350.00 $ 55,486 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 68,930 <br />Overhead and Profit Cost (12.60%) $ 8,685 <br />Contract Cost 77,615 <br />Project Management (9.25%) $ 6,376 <br />Additional Financial Warranty Required For Phase 10 $ 83,991 <br />Phas® 11 (9.33 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Liner Required to Close Phase 8 (Credit) - Shell (160,033) cyd $ 2.25 $ (360,073) <br />Liner Required to Close Phase 8 (Credit) - Core (56,849) cyd $ 3.25 $ (184,761) <br />Permanent liner - Shell 250,775 cyd $ 2.25 $ 564,243 <br />Permanent liner - Core 89,084 cyd $ 3.25 $ 289,524 <br />Liner Required to Close Phase 11 - Shell 91,881 c}rd $ 2.25 $ 206,733 <br />Liner Required to Close Phase 11 - Core 32,640 cyd $ 3.25 $ 106,078 <br />Topsoil Area Above Water 2.5 ac $ 2,000 $ 4,972 <br />Revegetate Area Above Water 2.5 ac $ 1,000 $ 2,486 <br />Dewatering of Full Pit 146.5 Mil. Gal. $ 350.00 $ 51,274 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 682,977 <br />Overhead and Profit Cost (12.60%) $ 86,055 <br />Contract Cost 769,032 <br />Project Management (9.25%) $ 63,175 <br />Additional Financial Warranty Required For Phase 11 $ 832,208 <br />7 of 11