Laserfiche WebLink
J&T Consulting, Inc. GP Ranches LLC <br />West Farm Pit <br />4/8/2010 <br />ation Bond Quantities and Costs tpy <br />J&T Consultigg Inc. 07115 GP Ranches Rec Bond Calcs TR1 <br />Pha80 6 (9.50 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Liner Required to Close Phases 3,5 (Credit) - Shell (246,576) cyd $ 2.25 $ (554,796) <br />Liner Required to Close Phases 3,5 (Credit) - Core (88,829) cyd $ 3.25 $ (288,695) <br />Liner Required to Close Phase 6 - Shell 239,688 cyd $ 2.25 $ 539,299 <br />Liner Required to Close Phase 6 - Core 87,562 cyd $ 3.25 $ 284,578 <br />Topsoil Area Above Water 1.8 cyd $ 2.25 $ 4 <br />Revegetate Area Above Water 1.8 card $ 3.25 $ 6 <br />Dewatering of Full Pit 158.4 ac $ 350.00 $ 55,448 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 38,344 <br />Overhead and Profit Cost (12.60%) $ 4,831 <br />Contract Cost 43,175 <br />Project Management (9.25%) $ 3,547 <br />Additional Financial Warranty Required For Phase 6 $ 46,722 <br />Phas® 7 (9.35 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Liner Required to Close Phases 4,6 (Credit) - Shell (236,997) cyd $ 2.25 $ (533,244) <br />Liner Required to Close Phases 4,6 (Credit) - Core (86,579) cyd $ 3.25 $ (281,383) <br />Permanent liner - Shell 85,238 cyd $ 2.25 $ 191,786 <br />Permanent liner- Core 31,586 cyd $ 3.25 $ 102,654 <br />Liner Required to Close Phase 7 - Shell 145,375 cyd $ 2.25 $ 327,095 <br />Liner Required to Close Phase 7 - Core 53,870 cyd $ 3.25 $ 175,078 <br />Topsoil Area Above Water 1.8 ac $ 2,000 $ 3,645 <br />Revegetate Area Above Water 1.8 ac $ 1,000 $ 1,822 <br />Dewatering of Full Pit 155.8 Mil. Gal. $ 350.00 $ 54,524 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Di rect Cost $ 44,477 <br />Overhead and Profit Cost (12.60%) $ 5,604 <br />Contract Cost 50,082 <br />Project Management (9.25%) $ 4,114 <br />Additional Financial Warranty Required For Phase 7 $ 54,196 <br />5 of 11