Laserfiche WebLink
• <br />DILL PIT <br />Exhibit D <br />0 <br />e) Specify the reclamation treatment of any waste rock dumps, tailing <br />impoundments, underground mine openings, ditches, sediment control facilities, <br />buildings and other features not addressed: This will be an open-pit surface mining <br />operation. All rocks will be used in production so there will be no waste rock. There will <br />be no dumps, tailing impoundments, underground mine openings, ditches, sediment <br />control facilities, buildings or any other features not involved in this narrative involved in <br />any way in this operation. <br />The storm water will flow through the pit area into the existing dry creek bed to <br />the north. From that point the dry creek flows approximately 0.50 miles on the owner's <br />property until it crosses Highway 24 and the property to the north. This will minimize <br />disturbance to the hydrologic balance, and prevent off-site damage. <br />l_ J