My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-06_REVISION - M2009077 (8)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009077
>
2010-04-06_REVISION - M2009077 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:22:41 PM
Creation date
4/7/2010 8:48:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009077
IBM Index Class Name
REVISION
Doc Date
4/6/2010
Doc Name
Submittal
From
Ed and Tracy Grimes
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Exhibit D <br />DILL PIT <br />RECLAMATION COST <br />• <br /> Qty Unit Cost Unit Cost <br />1 Replace overburden 3500 $0.58 LCY $2,030.00 <br />2 Vertical high wall reduction 0 $0.82 LCY $0.00 <br />2 Grass seed mix 50% failure rate 9.9 $163.25 ACRE $1,616.18 <br />3 Fertilizer - available N & P 9.9 $5.80 ACRE $57.42 <br />4 Topsoiling, scraper and dozer 25% swell 5600 $0.58 LCY $3,248.00 <br />5 Scarifying hard pan areas only 2AC 0 $0.04 SQYD $0.00 <br />6 Seedbed preparation and planting 9.9 $130.00 ACRE $1,287.00 <br />7 Mulching hay or straw 9.9 $220.00 ACRE $2,178.00 <br />8 Weed control 9.9 $35.00 ACRE $346.50 <br />9 Mobilization and demobilization 2 $750.00 EA $1,500.00 <br /> TOTAL DIRECT COST $12,263.10 <br /> INDIRECT COST OVERHEAD AND PROFIT <br /> PUBLIC LIABILITY INSURANCE 1.55% $190.08 <br /> CONTRACTOR PERFORMANCE BOND COST 1.55% $190.08 <br /> CONTRACTOR PROFIT 10.00% $1,226.31 <br /> DMG PROJECT ADMINISTRATION EXPENS E 5.00% $613.16 <br /> TOTAL PERFORMANCE BOND AMOUNT $14,482.73 <br /> DILL PIT COST/AC $1,462.90 <br />•
The URL can be used to link to this page
Your browser does not support the video tag.