Laserfiche WebLink
regraded, if necessary. They will be revegetated in accordance with the revegetation plan <br />set forth later in this section. <br />The facilities found on the surface, including the shop, office and warehouse buildings, <br />will be completely removed following mining activities. Concrete foundations will be <br />buried on site as shown on Map 12. Materials resulting from this removal will either be <br />sold to a local scrap dealer or hauled from the permit area to a suitable dump site. The <br />areas will then be regraded and revegetated. The access road from the surface facility to <br />the portal area will be revegetated at the conclusion of mining activities. The main <br />haul/access road into the property will be left at the conclusion of the mining as shown on <br />the Existing And Final Contours and Sections Map (Map 12). The access road or other <br />roads no longer needed for operations, reclamation, or environmental monitoring, will be <br />restored. Roadbeds will be rounded and shaped to conform with the adjacent terrain and <br />to meet natural drainage restoration standards. At the completion of this regrading, <br />topsoil will be applied and revegetation will commence. <br />Topsoil Structures. Stockpiled topsoil used for reclamation purposes will not be moved <br />until required for redistribution on a graded area. The topsoil will be redistributed so as to <br />achieve an approximate uniform and stable thickness and to minimize compaction. At the <br />cessation of mining operations, all topsoil will be removed from the stockpile and <br />redistributed prior to revegetation. <br />The detailed plans for initial removal, storage and subsequent redistribution of topsoil <br />used for reclamation purposes are discussed later in this Section and also in Section <br />2.05.3. <br />/~1 R-ate z.os-s2 osios <br />A PPRoVE/~ <br />9/tea/o 6 <br />