My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-05_PERMIT FILE - C1981033A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981033A
>
2010-03-05_PERMIT FILE - C1981033A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:00:44 PM
Creation date
3/18/2010 11:12:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033A
IBM Index Class Name
Permit File
Doc Date
3/5/2010
Section_Exhibit Name
Rule 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
regraded, if necessary. They will be revegetated in accordance with the revegetation plan <br />set forth later in this section. <br />The facilities found on the surface, including the shop, office and warehouse buildings, <br />will be completely removed following mining activities. Concrete foundations will be <br />buried on site as shown on Map 12. Materials resulting from this removal will either be <br />sold to a local scrap dealer or hauled from the permit area to a suitable dump site. The <br />areas will then be regraded and revegetated. The access road from the surface facility to <br />the portal area will be revegetated at the conclusion of mining activities. The main <br />haul/access road into the property will be left at the conclusion of the mining as shown on <br />the Existing And Final Contours and Sections Map (Map 12). The access road or other <br />roads no longer needed for operations, reclamation, or environmental monitoring, will be <br />restored. Roadbeds will be rounded and shaped to conform with the adjacent terrain and <br />to meet natural drainage restoration standards. At the completion of this regrading, <br />topsoil will be applied and revegetation will commence. <br />Topsoil Structures. Stockpiled topsoil used for reclamation purposes will not be moved <br />until required for redistribution on a graded area. The topsoil will be redistributed so as to <br />achieve an approximate uniform and stable thickness and to minimize compaction. At the <br />cessation of mining operations, all topsoil will be removed from the stockpile and <br />redistributed prior to revegetation. <br />The detailed plans for initial removal, storage and subsequent redistribution of topsoil <br />used for reclamation purposes are discussed later in this Section and also in Section <br />2.05.3. <br />/~1 R-ate z.os-s2 osios <br />A PPRoVE/~ <br />9/tea/o 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.