Laserfiche WebLink
The material cleaned from the pond is being dried on the coal stockpile area immediately <br /> south of Highway 12 across from pond 8 (shown below). This material will be worked when <br /> possible, to promote drying , before final disposition in the RDA or a development waste pile <br /> yet to be permitted. <br /> *�4; w L� <br /> W As <br /> Drainage from the coal r <br /> stockpile area mentioned ' <br /> above is diverted to the south r" <br /> side of the Purgatoire River <br /> by a pipe, consisting of a iron <br /> or steel initial section joined to t.. Sag at joint due <br /> black plastic pipe. Some to ground <br /> ground settlement has settlement <br /> occurred under the first joint r <br /> in the pipe and may be <br /> precluding continuous flow <br /> through the pipe, on its way to <br /> pond 7. The operator should <br /> improve the grade of the pipe <br /> and/or replace the pipe if <br /> necessary. <br /> 4 <br />