III. COMMENTS - COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> This was a partial inspection conducted by Kent Gorham of the Colorado Division of <br /> Reclamation, Mining, and Safety(Division). This underground mine continues to prepare to <br /> evaluate conditions in the mine in preparation to re-start mining operations late this year, <br /> after DRMS review and approval of a new mine plan. Ground conditions on this day were <br /> snow-covered due to a significant storm within the last 48 hours. The weather was sunny <br /> and cool with temperatures in the mid 30's. <br /> Other than pond cleanout work, activity at the site has been limited since the last inspection. <br /> Hydrologic Balance <br /> The cleanout at Pond 8 is complete. Equipment has been moved south across Highway 12 <br /> to the facility area. The pond will be surveyed to determine that the required sediment <br /> capacity has been restored. The operator has also recorded a load count to verify the <br /> amount of material removed from the pond, shown below. <br /> V - Y:Va.Y <br /> i" Approximate height w.. <br /> of 10-12 feet - <br /> 2010 3 <br /> 3 <br />