2009 Climax Mine Reclamation Report <br />Storke Yard <br />New reclamation in Storke Yard was completed on approximately 1,400 linear feet of new safety <br />berms constructed along the road down to the water treatment facility in 2009. The berms were <br />constructed using clean fill material. The berms and associated disturbance (0.47 acres) were <br />hydromulched and hydroseeded with a Biosol application of 1000 lbs/acre. This reclamation is <br />shown on Map 3 of 3. <br />Reclamation Maintenance <br />3 Dam <br />Approximately 1.5 acres of reclamation on the crest of 3 Dam were repaired in 2009 (Table 1). <br />Approximately 600 cubic yard of Class A biosolids was hauled and placed and the area was <br />broadcast seeded. Additionally, 5.11 acres of reclamation were repaired at the base of 3 Dam <br />(Table 1). Several seeps at the base of the dam required maintenance in 2009 disturbing <br />reclamation around the seeps and along the access routes. These areas were hydromulched and <br />hydroseeded with a Biosol application of 1000 lbs/acre. This reclamation is shown on Map 1 of <br />3. <br />5 Dam <br />Reclamation at the base of 5 Dam required repair after the installation of a new pumpback <br />pipeline in the fall of 2008. This area was approximately 2.93 acres in size and was regraded, <br />hydromulched, and hydroseeded with a Biosol application of 1000 lbs/acre (Table 1). This <br />reclamation is shown on Map 1 of 3. <br />Chalk Mountain Pipeline <br />The pipeline corridor that runs along the south edge of the Climax Mine was redisturbed in 2009 <br />to install a new pipeline. This corridor was seeded and hydromulched by Slater Seeding. The <br />westernmost section of the pipeline corridor was not disturbed in 2009, but did receive some <br />construction traffic with the installation of the other pipeline. This area was also hydroseeded in <br />2009. In total 8.42 acres of reclamation maintenance was conducted on the Chalk Mountain <br />Pipeline Corridor in 2009 (Table 1). This reclamation is shown on Map 3 of 3. <br />E Dump <br />Several bare patches were repaired in the reclamation on the west facing side of E Dump. The <br />bare patches were though to be the result of the acid material in the substrate and erosion. Clean <br />topsoil was spread over each area and then it was hydromulched and hydroseeded. Biosol was <br />spread on one small area that was too difficult to access with the topsoil. In total 0.53 acres of <br />reclamation was completed (Table 1). This reclamation is shown on Map 3 of 3. <br />East Side Channel <br />Several small patches on the steep slopes along the East Side Channel required maintenance in <br />2009 due to slumping and erosion. The three areas that had experience the worst erosion were <br />repaired and replaced with rock drains (Table 1). Other areas were simply regraded and reseeded. <br />The red subsoil that was used to construct the channel slopes is very susceptible to erosion and <br />difficult to revegetate without amendment. Because of this, the entire slope on both sides of the <br />channel was hydroseeded, hydromulched and treated with Biosol. This area was 5.91 acres and <br />included the repair areas. This reclamation is shown on Map 2 of 3. <br />Habitat Management, Inc. 3 December 2009