Laserfiche WebLink
2009 Climax Mine Reclamation Report <br />Table 1: 2009 Climax Reclamation Summary <br /> Biosolids Seed <br /> <br />Acres <br />Lime <br />Class A <br />Biosol Hydro- <br />mulch <br />Topsoil Climax <br />Mix Other <br />Reclamation <br />Location Treated* Acres Tons Acres Yds Acres Lbs Acres Acres Acres Item Acres <br />N ew Reclamation <br />1 Dam 37.66 37.66 37.66 <br />McNulty Curve <br />(East of Hwy 91) <br />3.77 <br />3.77 <br />3,768 <br />3.77 <br />3.77 <br />Robinson Lake 1.10 1.10 1,102 1.10 1.10 <br />Storke Yard 0.47 0.47 470 0.47 0.47 <br />Maintenance <br />3 Dam 6.61 1.5 600 5.11 5,110 5.11 6.61 <br />5 Dam 2.93 2.93 2,930 2.93 2.93 <br />Chalk Mountain <br />Pipeline <br />8.42 <br />5.03 <br />8.42 <br />E Dump 0.53 0.07 70 0.53 0.46 0.53 <br /> <br />East Side Channel <br />5.91 <br />5.91 <br />5,912 <br />5.91 <br />5.91 3 Rock <br />Drains <br />0.06 <br />Storke Yard 0.12 0.12 120 0.12 0.12 <br />Total 67.52 0 0 1.5 600 19.48 19,481 24.97 38.12 67.52 0.06 <br />* Adjusted for slope <br />Habitat Management, Inc. 2 December 2009