Laserfiche WebLink
..... <br />. <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Fuel Tanker, 6x4, 210 HP $81.57 34 $2,773.30 $2,773.30 <br />-tube Truck, 6x4, 210 HP $96.85 3 $290.55 $290.55 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $3,063.85 $3,063.85 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Ft. Collins <br />Transportation Cycle Time : Non- Total one-way travel distance : 33 <br />0 miles <br /> . <br /> Roadable Roadable Average travel speed : _30.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.10 1.10 Total non-roadable mob/demob cost $0.00 <br />Return time (hours) = 1.10 1.10 * two round trips with haul rig <br />Loading time (hours) = NA Total roadable mob/demob cost ** : $6,740.47 <br />Unloading time (hours) = NA one round trip, no haul rig <br />Subtotals = 2.20 2.20 <br /> <br /> <br /> <br />JOB TIME AND COST ..... <br /> <br />Total job time : <br />..... <br />2.20 hours <br /> Total job cost : $6,740