Laserfiche WebLink
CIRCES Cost Estimatinq Software <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining, And Safety <br />Task #: 026 State : Colorado Permit/job # : P2008043 <br />Date : 0310412010 County : Weld Abbreviation :none <br />User : ACS Site : Centennial Uranium Project Filename : P043-026 <br />Permit or other job action : Modification MD-03 <br /> <br />Task description : Load fence and pipe debris into haul truck <br /> <br />HOURLY EQUIPMENT COST <br /> <br />Truck make-up Description Data <br />Source <br />Make and model : Truck Tractor, 6x4, 50K GVW (CRG) <br />Attachment no. 1 : NA NA <br />Attachment no. 2: NA NA <br />Labor unit no. 1 : General Laborer (table) <br />Labor unit no. 2 : General Laborer (table) <br />Horsepower: 310 <br />labor zone : 1 Weight : 9.50 US tons <br />Job shift basis : 1 per day <br /> Job utilization <br />Cost Breakdown : Ownership cost/hour : $13.16 NA <br />Operating cost/hour : $33.36 100% <br />Operator(s) cost/hour : $50.31 NA <br />Total unit cost/hour : $96.83 <br />Total fleet cost/hour : $96.83 <br />JOB TIME Total job time : 2.00 Hours <br />JOB COST <br />Fleet size : 1 Truck(s) Unit cost : $96.83 /hour <br />Total job cost : $194