Laserfiche WebLink
CIRCES Cost Estimating Software <br />MFNT MOBILIZATION / DEMOBIL12 <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining, And Safety <br />Task # : 023 State : Colorado Permitijob #: P2008043 <br />Date : 03/03/2010 County : Weld Abbreviation :none <br />User : ACS Site : Centennial Uranium Project Filename : P043-023 <br />Permit or other job action : Modification Md-03 <br />Task description : Deliver fuel, periodic lube, oil, filter service <br /> <br />........................................................ <br /> <br />EQUIPMENT TRANSPORT RIG COST <br />........................ <br />Shift basis : <br /> <br />1 per ay <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br /> Operating cost/hour : $44.38 $46.13 $50.07 <br /> Operator cost/hour : $27.66 $27.66 $27.66 <br /> Helper cost/hour : $0.00 $25.39 $25.39 <br /> Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />a.- M AMA 151 0 C^I 11011ACWT <br />sheet 1 of 2