My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-17_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2007-12-17_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:39 PM
Creation date
2/18/2010 8:59:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
12/17/2007
Doc Name
Letter & Application and Public Notice
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR52
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie Resources, LLC <br />Proposed 2008 thru 2010 GOB VENT HOLES <br />Reclamation Worksheet <br />Exploration Holes <br />12/14/2007 <br />Sealing Expense <br />Hole Variables <br />Number of Holes to be Sealed 13 Hales <br />Miles of Road to be Reclaimed 3.20 Miles <br />Rotary Hole Diameter 9.375 Inches <br />Rotary Footage 20,660 Feet <br />Cubic Foot of Hole per Sack of Cement 1 CF <br />Sealing Materials -Variables <br />Cement per Sack $ 8,25 <br />Bentonte per 3 cu.ft. Sack $ 6.00 <br />Plugs $ 145.24 <br />Hole Markers $ 3.56 <br />Sealing Materials -Volumes <br />Cement in Sacks 9,904 Each <br />Bentonite in Sacks Each <br />Plugs 13 Each <br />Hole Markers 13 Each <br />Rig Expense <br />Rig Time to Pull Casing 2 <br />Rig Time to Seal Hole 6 Hours <br />Rig Time per hour Cost $ 152.20 <br />Total Cost, Sealing Rig Cost $ 15,829 <br />Water Cost <br />Hours per Hole 8 Hours <br />Cost per Hour for Water Truck and Driver $ 56.40 <br />Total Water Cost $ 5,865.60 <br />Sealing Materials -Expense <br />Cement in Sacks $ 81,706.24 <br />Bentonite in Sacks $ - <br />Plugs $ 1,888.12 <br />Hole Markers $ 46.28 <br />Total Cost Sealing Materials $ 83,640.64 <br />Total Sealing Expense $ 105,335 <br /> <br />SubtotalTotal Reclamation Cost $ 160,405 <br />Burden 25% 40101 <br />Total Reclamation Cost $ 200,507 <br />Pad Variables <br />Length 190 Feet <br />Width 240 Feet <br />Acres/Pad 1.05 Acres <br />Total Acres 13.61 Acres <br />Regrading <br />Equipment Hours per Pad 4 Hours <br />Equipment Cost per Hour $ 90.00 <br />Equipment Cost per Pad $ 360.00 <br />Total Regrading Cost $ 4,680.00 <br />Reseeding <br />Seeding & Mulching Cost Per Acre $ 1,500.00 <br />Acres to Reseed 13.61 <br />Total Reseeding Cost $ 20,413.22 <br />Total Drill Pad Reclamation $ 25,093.22 <br />Road Reclamation <br />Road Variables <br />Length of Road to be Narrowed or Reclaimed 17,000 Feet <br />Average Width of Road 35 Feet <br />Total Area to be Reclaimed 13.50 Acres <br />Acres/Mile 4.22 Acres <br />Regrading <br />Equipment Work as Hours per Acre 8.00 <br />Equipment Cost per Hour $ 90.00 <br />Equipment Cost per Acre $ 720.00 <br />Total Equipment Cost $ 9,722.31 <br />Reseeding <br />Seeding & Mulching Cost Per Acre $ 1,500.00 <br />Acres to Reseed 13,50 <br />Total Reseeding Cost $ 20,254.82 <br />Total Road Reclamation Cost $ 29,977.13 <br />Page t
The URL can be used to link to this page
Your browser does not support the video tag.