My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-17_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2007-12-17_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:39 PM
Creation date
2/18/2010 8:59:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
12/17/2007
Doc Name
Letter & Application and Public Notice
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR52
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie Resources, LLC <br />Credit for GVB-6F <br />Reclamation Worksheet <br />Exploration Holes <br />12/14/2007 <br />Hole Variables <br />Number of Holes to be Sealed 1 Holes <br />Miles of Road to be Reclaimed 0.10 Miles <br />Rotary Hole Diameter 8.000 Inches <br />Rotary Footage 1,712 Feet <br />Cubic Foot of Hole per Sack of Cement 1 CF <br />Sealing Materials -Variables <br />Cement per Sack $ 8.25 <br />Benton' per 3 cu.ft. Sack $ 6.00 <br />Plugs $ 145.24 <br />Hole Markers $ 3.56 <br />Sealing Materials -Volumes <br />Cement in Sacks 598 Each <br />Bentonte in Sacks Each <br />Plugs 1 Each <br />Hole Markers 1 Each <br />Rig Expense <br />Rig Time to Pull Casing 2 <br />Rig Time to Seal Hole 6 Hours <br />Rig Time per hour Cost $ 152.20 <br />Total Cost, Sealing Rig Cost $ 1,218 <br />Water Cost <br />Hours per Hole 8 Hours <br />Cost per Hour for Water Truck and Driver $ 56.40 <br />Total Water Cost $ 451.20 <br />Sealing Materials - Expense <br />Cement in Sacks $ 4,930.22 <br />Bentonite in Sacks $ - <br />Plugs $ 145.24 <br />Hole Markers $ 3.56 <br />Total Cost Sealing Materials $ 5,079.02 <br />Total Sealing Expense $ 6.748 <br /> <br />SubtotalTotal Reclamation Cost $ 9,324 <br />Burden 25% 2331 <br />Total Reclamation Cost $ 11,655 <br />Drill Pad Reclamation <br />Pad Variables <br />Length <br />Width <br />Acres/Pad <br />Total Acres <br />Regrading <br />Equipment Hours per Pad <br />Equipment Cost per Hour <br />Equipment Cost per Pad <br />Total Regrading Cost $ 360.00 <br />Reseeding <br />Seeding & Mulching Cost Per Acre $ 1,500.00 <br />Acres to Reseed 1.05 <br />Total Reseeding Cost $ 1,570.25 <br />Total Drill Pad Reclamation $ 1,930.25 <br />Road Reclamation <br />Road Variables <br />Length of Road to be Narrowed or Reclaimed 528 Feet <br />Average Width of Road 24 Feet <br />Total Area to be Reclaimed 0.29091 Acres <br />Acres/Mile 2.91 Acres <br />Regrading <br />Equipment Work as Hours per Acre 8.00 <br />Equipment Cost per Hour $ 90.00 <br />Equipment Cost per Acre $ 720.00 <br />Total Equipment Cost $ 209.45 <br />Reseeding <br />Seeding & Mulching Cost Per Acre $ 1,500.00 <br />Acres to Reseed 0.29 <br />Total Reseeding Cost $ 436.36 <br />Total Road Reclamation Cost $ 645.82 <br />4 Hours <br />$ 90.00 <br />$ 360.00 <br />190 Feet <br />240 Feet <br />1.05 Acres <br />1.05 Acres <br />Page 1
The URL can be used to link to this page
Your browser does not support the video tag.