Laserfiche WebLink
Bowie Resources, LLC <br />Proposed 2008 thru 2010 GOB VENT HOLES <br />Hole Description Worksheet <br />Hole No. Surface Elevation Drilling-2008 Drilling-2009 Drilling-2010 <br />GVB-8A 6720 1210 <br />GVB-8B 7640 1800 <br />GVB-9B 7680 1480 <br />GVB-9C 7560 1700 <br />GVB-9D 6720 1225 <br />GVB-9E 7640 1660 <br />GVB-10B 7680 1925 <br />GVB-10C 7560 1650 <br />GVB-10D 7620 1600 <br />GVB-10E 7660 1890 <br />GVB-11 C 7280 1380 <br />GVB-11 D 7780 1800 <br />GVB-11 E 7440 1340 <br />Totals 9075 7065 4520 <br />20660 <br />Reclamaiton Cost Summary Drill Hole Sealing Dirt Work & Seeding Total B Year <br /> 2008 $ 58,494 $ 68,838 $ 127,331 <br /> 2009 $ 44,014 $ 44,014 <br /> 2010 $ 29,161 $ 29,161 <br /> Total $ 131,669 $ 200,506 <br />Page 1