Laserfiche WebLink
U G( . <br />sheet 1 of 2 <br />CIRCES Cost Estimatina Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />Task #: LIN State :Colorado Permit/job # :M-2001-085 <br />Date : 0112612010 County :Adams Abbreviation :none <br />User : DB2 Site :120Th Estates Pit Filename: M085-LIN <br />Permit or other job action :Am-04 Bond Recalc <br />Task description :Place clay liner <br />HOURLY EQUIPMENT COST <br />Description <br />Shift basis : 1 per day <br />Cost Bre <br />Scraper work team -Scraper: Cat 657E w/push-pull <br />-Push dozer NA <br />Support equipment -Load area :INA <br />-Dump area :I Cat D7R DS Series 11 - 7SU <br />Road maintenance -Motor grader :INA <br />-Water truck l Water Tanker, 2,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA dozer NA misctruk <br />% Utilization-machine : 100 NA NA 50 NA 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $113.35 NA NA $40.93 NA $8.32 <br />Operating cost/hour : $202.03 NA NA $26.57 NA $3.75 <br />Ripper op. cost/hour : NA NA NA $0.00 NA NA <br />Operator cost/hour : $38.91 NA NA $38.54 NA $38.70 <br />Unit subtotals : $354.29 NA NA $106.04 NA $50.76 <br />Number of units : 4 0 0 1 0 1 <br />Group subtotals : Work : $1,417.15 Support : $106.04 Maintenance : $50.76 <br />Total work team cost/hour : $1,573.95 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 190,000 CCY factor : 1.125 volume : 213,750 LCY <br />Source of quantity take-off :estimated <br />Source of estimated swell factor :na