My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-02_REVISION - M2001085
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001085
>
2010-02-02_REVISION - M2001085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:16 PM
Creation date
2/4/2010 7:26:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
REVISION
Doc Date
2/2/2010
Doc Name
Amendment Approval
From
DRMS
To
Les Ewegen LLC
Type & Sequence
AM4
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT IDENTIFICATION <br />Task #: COM <br />Date <br />User <br />CIRCES Cost Estimating Software <br />COMPACTION WORK <br />State : Colorado <br />26-Jan-2010 County:Adams <br />Permit/job # :M-2001-085 <br />Abbreviation :none <br />DB2 Site :120Th ,Avenue Estates Pit Filename :M085-COM <br />Agency or organization name: DRMS <br />Permit or other job action :AM-04 Bond Reca/c _ <br />Task description : Compaction before placing clay liner <br />HOURLY EQUIPMENT COST <br />Machine description :CAT CP-563E <br />Compactor type : Single padded drum vibratory <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Loose <br />Horsepower : 143 <br />Shift basis : 1 per day <br />Utilization % Data source : (CRG) <br />Ownership cost/hour : $23.83 NA <br />Operating cost/hour : $24.92 100 <br />Operator cost/hour : $38.10 NA <br />Total unit cost/hour : $86.85 Total fleet cost/hour : $86.85 <br />volume : 190,000 LCY <br />Shrinkage Compacted <br />factor : 0.800 volume : 152,000 CCY <br />Source of estimated volume: estiamted from Ground Engineering rot <br />Source of estimated shrinkage factor : na <br />HOURLY PRODUCTION <br />Unadiusted hourlv production = (W x S x L x C) / P <br />Compacted width per pass (W) : 7.00 feet <br />Average compactor speed (S) : 6.00 mph <br />Compacted thickness of each lift (L) : 12.00 inches <br />Conversion constant (C) : 16.3 (5,280 ft./12 in./27 cu.ft.) <br />Required number of machine passes (P) : 3 passes <br />Unadjusted hourly unit production : 2,738.40 CCY/hr <br />Job Condition Correction Factors <br />Site altitude : 5,030 feet <br />JOB TIME AND COST <br />Fleet size <br />Source <br />Altitude adjustment factor : 0.98 (Cat HB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.82 multiplier <br />Adjusted hourly unit production : 2,238.78 CCY/hr <br />Adjusted hourly fleet production : 2,238.78 CCY/hr <br />1 compactor(s) Total job time : 67.89 hours <br />Unit cost $0.039 per CCY Total job cost : $5,896 <br />5 = -71 k
The URL can be used to link to this page
Your browser does not support the video tag.