My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-02_REVISION - M2001085
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001085
>
2010-02-02_REVISION - M2001085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:16 PM
Creation date
2/4/2010 7:26:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
REVISION
Doc Date
2/2/2010
Doc Name
Amendment Approval
From
DRMS
To
Les Ewegen LLC
Type & Sequence
AM4
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
() J <br />HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 2,500 pounds/LCY <br />Material description <br />Clay - Dry <br />Rated payload : 104,000 pounds <br />Payload capacity: 41.60 LCY <br />Cycle Time : <br />Struck volume : 32.00 LCY <br />Heaped volume : 44.00 LCY <br />Average volume : 38.00 LCY <br />Adjusted capacity : 38.00 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br />Job Condition Corrections : Site altitude (ft.) : 5,030 <br /> Scraper Push dozer Source <br />Altitude adj.: 1.000 NA (Cat HB) <br />Job efficiency : 0.830 NA (Cat HB) <br />Net correction : 0.830 NA <br />Scraper loading time * : 1.10 minutes <br />Maneuver and spread time : 0.60 minutes <br />* load time per scraper pair on push-pull models <br />Travel time : <br />Road condition description :Rutted dirt, little maintenance, no water, 1 " tire penetration <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 300 2.00 4.00 6.00 1908 0.33 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time : 0.33 minutes <br />" travel time for each segment is adjusted for acceleration/deceleration. Return time <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit production/hour : 2,007.89 LCY/hour *** Adjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br />0.24 <br />0.24 <br />2.27 <br />1, 666.55 <br />4 <br />3,333.10 <br />3,333.10 <br />minutes <br />minutes <br />LCY/hour <br />scraper(s) <br />LCY/hour <br />LCY/hour <br />
The URL can be used to link to this page
Your browser does not support the video tag.