Laserfiche WebLink
5 ? <br />PROJECT IDENTIFICATION <br />sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 019 State : Colorado Permit/job #: C-1983-059 <br />Date : 0410912008 County:Delta Abbreviation :none <br />User : JRS Site : Terror Creek Loadout Filename : C059-019 <br />Permit or other job action : Permit Renewal 05 <br />Task description : Mobilize/Demobilize <br />for Yearly Site Maintenance <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br /> <br />X -X <br />INnN_RnAnAR1 F F[]IIIPMFNT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D3G LGP - 3P 9.69 $11.79 $88.67 10 $1,004.63 $886.70 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $1,004.63 $886.70 $0.00 <br />CIRCES Cost Estimatina Software