Laserfiche WebLink
Y i <br />..: <br />vi.....,, .. :... :.: ....: ..: ... <br />ROADARLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 6x4, 45K GVW $119.56 1 $119.56 $119.56 <br />-Fuel Tanker, 4x2, 170 HP $63.62 1 $63.62 $63.62 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $183.18 $183.18 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Delta <br />Transportation Cycle Time : Non- Total one-way travel distance : 40.0 miles <br /> Roadable Roadable Average travel speed : 40.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.00 1.00 Total non-roadable mob/demob cost $6,126.21 <br />Return time (hours) = 1.00 1.00 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $366.35 <br />Unloading time (hours) = 0.50 NA ?• one round trip, no haul rig <br />Subtotals = 3.00 2.00 <br />JOB TIME AND COST <br />....................... . : <br />Total job time : 6.00 hours <br />Total job cost : $6,493