Laserfiche WebLink
<br />ROADABLE EQUIPMENT sheet 2 of 2 <br /> Nearest major city or town within project area region : Delta <br />Transoortation Cycle Time : Non- Total one-way travel distance : 40.0 miles <br /> Roadable Roadable Average travel speed : 40.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.00 1.00 Total non-roadable mob/demob cost $13,828.91 <br />Return time (hours) = 1.00 1.00 • two round trips with haul rig <br />Loading time (hours) = 2.50 NA Total roadable mob/demob cost ** : $0.00 <br />Unloading time (hours) = 2.50 NA *• one round trip, no haul rig <br />Subtotals = 7.00 2.00 <br />JOB TIME AND COST Total job time : 14.00 hours <br />Total job cost : $13,829 <br />.............................. <br />EQUIPMENT HAUL DISTANCE and TIME