My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1982056 (23)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
_INSPECTION - C1982056 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2020 9:15:55 AM
Creation date
1/26/2010 12:25:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
1/20/2010
Email Name
JHB
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS-COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made during the <br /> inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br /> evidence supporting the enforcement action. <br /> Hydrologic Balance cont.: Waste water pond gate valves were frozen. TCC thawed out the gate valve with <br /> a"weed-burner". This was effective and allowed the ponds to operate according to design and not overflow. <br /> Processing Waste: TCC continues to haul refuse to the existing CRDA. TCC is allowing refuse to drain at <br /> the southern end of the Existing.RDA. The 40 quarter Refuse Pile report included a map showing locations <br /> of the compaction tests. Once the RDA expansion is ready to accept refuse, TCC will begin closing in the <br /> road at the existing RDA. <br /> TCC will begin constructing underdrain once topsoil has been salvaged. Large and medium rock material is <br /> beginning to be delivered in order to commence construction of the underdrain. Large rock material is <br /> limestone from a quarry new Maybell. This material has been used successfully by TCC previously for <br /> riprap and has proven durable. The mid-grade rock material is 2.5"-4"cleaned river rock. <br /> Large durable limestone for RDA-exp.Underdrain..................................2.5"-4"river rock for RDA-exp. Underdrain <br /> Support Facilities: TCC needs to complete the removal of the hydraulic oil contaminated material at 6MN <br /> facilities area and at 18RT. The majority of the structures at 18RT have been removed. Please provide an <br /> abandonment report to the Division documenting the sealing methods, and compliance with the approved <br /> sealing plan and regulations, upon completion of sealing this shaft. Grading,backfill, and reclamation of the <br /> 18RT pad area are projected for 2010. <br /> 5 of 8 WHITE-File YELLOW-Operator PINK-Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.