Laserfiche WebLink
III. COMMENTS-COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made during the <br /> inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br /> evidence supporting the enforcement action. <br /> allow <br /> 18RT pad-hoist,MAC monitoring equipment and Propane tank moved to 18LT <br /> 18LT Ventilation shaft pad area construction is mostly completed. Contractors were working on connecting <br /> power lines at the substation. 18LT fan has been installed and was operating. Hoist building has erected at <br /> the 18LT pad. MCC building has been constructed. <br /> Please provide an abandonment report to the Division documenting the sealing methods, and compliance <br /> with the approved sealing plan and regulations, upon completion of sealing this EMD vent shaft. <br /> Subsidence: As the Longwall move into the WMD progresses, TCC is reminded that subsidence monitoring <br /> needs to be implemented prior to approach to Routt County Road No. 27. <br /> TCL p—JW a co-Q a s�V..-,dl IRro4 P•.+gs.d cR.¢c�i;.�. ri-� . <br /> 6 of 8 WHITE-File YELLOW-Operator PINK-Specialist <br />