My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-20_PERMIT FILE - M2009081
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009081
>
2010-01-20_PERMIT FILE - M2009081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:44 PM
Creation date
1/25/2010 7:40:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009081
IBM Index Class Name
PERMIT FILE
Doc Date
1/20/2010
Doc Name
Cost Summary Form
From
DRMS
To
Tierra Piedra Gravel Pit
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : DRMS <br />Permit or other job action :New 110c <br />Task description : Rip compaction in operations area <br />... .... <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D6R LGP - 6S (2003) Horsepower : 185 <br />Blade type :Straight <br />Attachment no. 1 :BOPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />MATERIAL QUANTITIES <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 1.00 acres Rip depth (ft) : 1.00 Volume : 1,613 BCY or CCY <br /> <br />Source of estimated quantity :application <br />Source of estimated load facto r :NA <br /> <br /> <br /> <br />HOURLY PRODUCTION . . :.:. <br />...:::.; <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 1,122.17 cu. yds./hour . <br /> <br />Area : Avg. ripping depth : 1.00 feet/pass Site altitude : 6,200 feet <br />Average ripping width : 6.58 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 150.00 feet/pass <br />Average dozer speed : 88.00 feet/minute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.696 acres/hour <br />Unadjusted production : 1,122.17 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production : 931.40 cu. yds./hour <br />Adjusted fleet production : 931.40 cu. yds./hour <br />Total job time : 1.73 hours <br />Unit cost : $0.126 per cu. yd. Total job cost : $204
The URL can be used to link to this page
Your browser does not support the video tag.