CIRCES Cost Estimating Software <br />WHEEL LOADER - LOAD AND CARRY WORK <br />.. . <br />PROJECT IDENTIFICATION <br />Task #: 003 State : Colorado Permit/job #: M-2009-081 <br />Date : 0111912010 <br />User : RCO <br />County : Archuleta <br />Site : Tierra Piedra Gravel Pit <br />Agency or organization name : DRMS <br />Permit or other job action : New 110c <br />Task description : Topsoil replacement on oerations area and upper banks <br /> <br />HOURLY EQUIPMENT COST Basic machine .. , <br />: CAT 908 Horsepower : <br />81 <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $9.58 NA <br />Operating cost/hour : $14.19 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $62.31 Total fleet cost/hour : $62.31 <br /> <br />MATERIAL QUANTITIES ......... .... <br />Initial Swell Final <br />volume : 807 CCY <br />factor : 1.125 volume : 908 LCY <br />Source of quantity take-off : 1 ac x 6" depth <br />Source of estimated swell factor; program <br />.:::..:.:.: ::. <br />HOURLY PRODUCTION (Cat H g) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.475 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : No adjustment - factor not applicable 0.000 (Cat HB) <br />Stockpile : No adjustment - factor not applicable 0.000 (Cat 148) <br />Truck ownership : No adjustment - factor not applicable 0.000 (Cat HB) <br />Operation : No adjustment - factor not applicable 0.000 (Cat HS) <br />Dump target : No adjustment - factor not applicable 0.000 (Cat HB) <br />Net cycle time adjustment <br />Adjusted basic cycle time <br />Rolling Resistance - Road Conditions <br />Haul : Rutted dirt, little maintenance, no water, 2"tire <br />Return ; Rutted dirt, little maintenance, no water, 2"tire <br />0.000 minutes <br />0.475 minutes <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 600 0.00 5.00 5.00 0.4232 (Cat HB) <br />Return route : 600 0.00 5.00 5.00 0.4232 (Cat HB) <br />Loader Bucket Capacity <br />Abbreviation : none <br />Filename : M081-003 <br />Total travel time : 0.8465 minutes <br />Total cycle time : 1.321 minutes <br />Rated capacity : 1.30 LCY (heaped) (Cat HB) <br />Bucket fill factor : 1.100 Other - rock/dirt mixtures (100-120%) <br />Adjusted capacity: 1,43 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 0.95 (Cat HB) <br />Site altitude : 6,200 feet Job efficiency factor : 0.83 (1 shift/day) <br /> Net correction : 0.79 multiplier <br />Unadjusted hourly unit production : 64.93 LCY/Hr <br />Adjusted hourly unit production : 51.20 LCY/Hr (Cat HB) <br />Adjusted hourly fleet production : 51.20 LCY/Hr <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time : 17.73 Hours <br />Unit cost : $1.217 /LCY Total job cost : $1,105