Laserfiche WebLink
CIRCES Cost Estimatina Software <br />BULLDOZER WORK <br />;........... <br />PROJECT IDENTIFICATION <br />Task #: 001 State : Colorado Permit/job# : M-2009-081 <br />Date <br />User <br />01/19/2010 <br />RCO <br />Agency or organization name: DRMS <br />Permit or other job action :New 110c <br />Task description : Finish grade operations area and upper banks <br />_.. <br />: <br />.................... .................. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D6R LGP - 6S (2003) Horsepower : 185 <br />Blade type :Straight <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $32.98 NA <br /> Operating cost/hour : $43.48 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $115.00 Total fleet cost/hour : $115.00 <br /> <br />MATERIAL QUANTITIES ....... <br />Initial Swell Loose <br />volume : 807 CCY factor : 1.165 volume : 940 LCY <br />Source of estimated volume :application <br />Source of estimated swell factor :program <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (a vg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 444.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.70 (fnd-m1) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,200 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.35 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 154.19 LCY/hr <br /> Adjusted fleet production : 154.19 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 6.10 Hours <br />Unit cost : $0.746 /LCY Total job cost : $701 <br /> <br />County :Archuleta <br />Site : Tierra Piedra Gravel Pit <br />Abbreviation :none <br />Filename :M081-001