Laserfiche WebLink
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $10.23 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Dozer and ROPS : $10.23 NA NA $4.71 $8.86 $5.81 $7.84 NA NA NA NA <br />-Attachment no. 2: NA NA NA $0.53 $0.57 $0.88 $0.71 NA NA NA NA <br />Annual usage : $16.81 $9.04 $7.13 NA NA NA NA NA NA NA NA <br />Double shifts : $12.61 $4.52 $3.57 NA NA NA NA NA NA NA NA <br />Triple shifts : $11.21 $3.01 $2.38 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $2.75 NA $3.39 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.31 NA $0.51 NA NA NA NA NA <br />Fuel/tube -Dozer and ROPS : NA NA NA NA NA NA NA $15.87 $3.35 $0.00 $1.42 <br />Attachment no. 2: NA NA NA NA NA NA NA $0.00 $0.14 $0.00 $0.59 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts • Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2: Dozer and ROPS : <br />Single shifts : $16.81 $9.04 $7.13 $2.75 $8.86 $3.39 $7.84 $15.87 $3.35 $0.00 $1.42 <br />Double shifts : $12.61 $4.52 $3.57 ttachment no. 2: <br />Triple shifts : $11.21 $3.01 $2.38 $0.31 $0.57 $0.51 $0.71 $0.00 $0.14 $0.00 $0.59 <br /> <br />HOURLY OPERATOR WAGES <br />Base _.. _ <br />Fringe : :::: _ ... .... <br />F.I.C.A. .... .....:: <br />Unempl. :: <br />Wk.Comp. <br />Total ..::.... .. <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Day: $0.00 Two shift per day average : $0.15 <br />Dozer operator (>=70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $16.74 $4.20 $1.28 $1.04 $1.67 $24.93 Night: $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operatin <br />Machine g and Overhaul <br />Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $32.98 $43.48 $2.83 $38.54 $117.83 <br />Double shifts : $20.69 $43.48 $2.83 $38.69 $105.70 <br />Triple shifts : $16.60 $43.48 $2.83 $38.79 $101.70 <br />....................................... <br />...................................... <br />...................................... <br />....................................... <br />PERFORMANCE DATA <br />Dozer : Cat D6R LGP - 6S (2003, <br />Blade :Straight <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Horsepower <br />(FHP) Transmission <br />Type Weight <br />(UST) Length <br />(ft) Width <br />(ft) Height <br />(ft) <br />185 NA 22.6 17.9 10.3 10.4 <br />NA NA 4.0 NA 13.1 4.0 <br />NA NA NA NA NA NA <br />NA NA 1.8 3.3 6.6 1.6 <br />Total weight : 28.4 (UST) <br />Fuel Ripper <br />type type <br />diesel NA <br />NA NA <br />NA NA <br />NA Parallelogram