Laserfiche WebLink
15.0 Construction Quality Assurance Quality Control <br />• Plan <br />Adequate Quality Assurance/ Quality Control (QA/QC) will be conducted in <br />accordance with manufacturer's instructions. For informational purposes, product <br />data from Colorado Lining International was used to develop Exhibit 15-1 which <br />provides specifications for a 30 mil PVC geomembrane. Additional information can be <br />obtained from www.coloradolining.com. <br />EAhihit 15.1 PVC In mil GP_ememhrane Liner Specifications <br />• <br />Certified Properties ASTM Standard Value <br />Thickness D-5199 30 +/- 1.5 mil <br />0.76 +/- 0.04 mm <br />Tensile Properties <br />Strength at Break <br />Elongation <br />Modulus at 100% D-882 (Min) <br />73 Ibs/in <br />380% <br />32 Ibs/in <br />Tear Strength D-1004 Min 8 Ibs <br />Dimensional Stability D-1204 Max Ch 3% <br />Low Temperature Impact D-1790 -20 de F <br />Index Properties ASTM Standard Value <br />Specific Gravity D-792 (Typical) 1.2 /cc <br />Water Extraction (Percent Loss <br />Max D-1239 0.15% <br />Average Plasticizer Molecular <br />Weight D-2124 400 <br />Volatile Loss (Percent Loss Max) D-1203 0.7% <br />Soil Burial <br />Break Strength <br />Elongation <br />Modulus at 100% G-160 (Max Chg) <br />5% <br />20% <br />20% <br />Hydrostatic Resistance D-751 100 psi <br />Shear Properties ASTM Standard Value <br />Shear Strength D-882 58.4 Ibs/in <br />Peel Strength D-882 15 Ibs/in <br />Notes: A similar product from a different vendor may be procured; therefore, geomembrane <br />specifications may vary. <br />Prior to installation of the liner, a QC inspector will verify that the surface bedding of <br />the liner has been smoothened and freed of all sharp rocks (all rock and stone greater <br />than 1 inch diameter), objects, vegetation, and other miscellaneous debris. <br />Immediately prior to the placement of backfill, the geomembrane, seams, and non- <br />seam areas will be visually inspected by a QC inspector for defects, holes, or damage <br />due to weather conditions or construction activities. At the QC inspector's discretion, <br />the surface of the geomembrane liner will be brushed, blown, or washed as necessary <br />if the amount of dust, mud, or foreign material inhibits inspection or functioning of <br />the overlying material. All damage to the geomembrane liner will be repaired prior to <br />the placement of backfill. Detailed QA/QC requirements will be provided in the <br />• technical specifications provided in the design for DRMS review and approval. <br />15-1 <br />T:\64986-Denison Mines\Task Order 4 - EPP Sunday Mines Group-Van4\Sunday Mines Group\DRMS RTC and Revised EPP\FINAL DRMS Report - EPP Sunday Mines.doc