14.0 Construction Schedule <br />Construction of the proposed ore storage pads will occur following approval of the <br />design from DRMS and prior to ore production. Surface preparation at each ore <br />storage pad area will be completed, followed by the installation of the PVC <br />geomembrane, then backfill. Denison will notify DRMS in writing 10 working days <br />prior to construction so that a pre-construction inspection can be conducted and, if need <br />be, construction oversight scheduled. It is anticipated that the construction timeframe <br />to complete all ore storage pads will be less than two months upon commencement of <br />these activities. Following construction of each of the ore pads, Denison will provide <br />DRMS with certification by a professional engineer or other appropriately qualified <br />professional that will confirm that the facilities have been constructed in accordance <br />with the approved design plan. <br />• <br />• <br />14-1 <br />T:\64986-Denison Mines\Task Order 4 - EPP Sunday Mines Group.Van4\Sunday Mines Group\DRMS RTC and Revised EPP\FINAL DRMS Report- EPP Sunday Mines.doc