Laserfiche WebLink
concrete, asphalt for roads or provide new base material for any new roads within an economic <br />distance from the site. <br />The pit roads will be hafd paeked , appr-exiffta4ely 28 feet wide and will have faffips a4 a gfade <br />of 101,; te-thhefflining pit- Tote-haul roads will connect the Gehrman Pit to the Bunn Ranch site. <br />14. Topsoil and Overburden Handling <br />Topsoil removed from Phase 1 will be placed in the topsoil storage area along the Ana Branch <br />Overburden from Phase 1 will be stored to the west of the pit This material will remain in place <br />over the course of mining since most topsoil and overburden from new mining will be placed in <br />the previously mined out area. Potential storage areas are shown on Map C-2. of the added e&e-a <br /> <br />Most reject material produced from the processing of material on the Bunn Ranch site will be <br />placed at the Bunn Ranch site. Some reject material may return to the Gehrman Pit if it is needed <br />for reclamation. <br />Table D-4 <br /> Area <br />(acres) TS Volume <br />(CY) OB Volume <br />(CY) Material Needed to <br />Reclaim Net material after <br />reclamation <br />Phase 1 9.0 14,520 43,560 41,089 16,991 <br />Phase 2 9.6 15,488 46,464 50,218 11,734 <br />Phase 3 8.2 13,229 39,688 41,446 11,471 <br />Total 26.8 43,237 129,712 132,753 40,196 <br />Gehrman Pit October 09 D-5