My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-30_PERMIT FILE - M2010002
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010002
>
2009-12-30_PERMIT FILE - M2010002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:12 PM
Creation date
1/12/2010 7:48:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010002
IBM Index Class Name
PERMIT FILE
Doc Date
12/30/2009
Doc Name
New 110c application
From
Wagner Rock LLC
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(k) Refuse and acid-forming or toxic materials exposed handling and disposal. <br />No refuse and acid forming or toxic materials will be involved in this <br />operation. The operation will be producing rock, sand and gravel, materials <br />with no chemicals required for processing and refuse will not be generated. <br />Rock, Sand and Gravel are basically inert materials. <br />(1) Measures to minimize disturbance to the hydrological balance, prevent offsite <br />drainage, and provide for a stable configuration of the reclaimed area <br />consistent with the proposed future land use. <br />The hydrologic balance issue has been addressed previously in Site <br />Description (c), and items (i) and 0) above. A stable configuration will <br />be accomplished by the 3:1 or less back-sloping of the backfilled <br />excavation area into the pond. <br />(in) Specify whether the deposit will be processed on-site. <br />As stated in (e) 4 above, there are plans to provide for a portable crusher or <br />screening plant to process material at this site. All material will be handled <br />onsite using tracked excavators, bulldozers and front-end loaders to <br />temporarily stockpile and load to haul trucks. Material stockpiles may be <br />produced and reduced on a daily basis or will be conveniently located adjacent <br />to/in the active mine pit areas as excavation activities proceed. No structures <br />are proposed onsite. <br />(n) Primary and secondary commodities to be mined/extracted and intended use. <br />The primary commodities to be mined onsite will be rock, and crushed rock <br />for sand, gravel, and backfill soil. The intended use of these materials will be <br />as construction materials, structural rip-rap, crushed rock and road gravel base <br />course and fill material for road construction activities. There are no <br />secondary commodities to be mined and/or extracted at this site. <br />(o) Incidental products to be mined and/or extracted. <br />There are no incidental products to be mined and/or extracted by the proposed <br />operation.
The URL can be used to link to this page
Your browser does not support the video tag.