Laserfiche WebLink
3.04 BLASTING <br />The CONTRACTOR shall compact the surface of the area that has been blasted. If the blasted surface is <br />below the Soil Liner subgrade elevation, the CONTRACTOR shall compact the blasted surface using a <br />method specification approved by the CERTIFYING ENGINEER, and then remediate according to the <br />DRAWINGS to achieve the design grades and elevations. If the blasted surface is above the Soil Liner <br />subgrade elevation, the CERTIFYING ENGINEER assess the foundation conditions and recommend <br />whether the CONTRACTOR shall overexcavate and backfill with Cemented Rockfill and Structural Fill, or if <br />the CONTRACTOR shall remove excess material and compact the final grade surface using a method <br />specification approved by the CERTIFYING ENGINEER. <br />* ** END OF SECTION * ** <br />i <br />• <br />Section 02210 <br />Underground Working Remediation <br />Page 3 of 3 <br />September 3, 2008 <br />Revision 1 <br />SAProjects\7125E CCV CQA\I - Tech Specs \02210A.doc <br />