My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (32)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:54:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. E, Tech Specs. 2
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'Im <br />SECTION 02271.0 RIP RAP <br />PART 1: GENERAL <br />1.01 DESCRIPTION <br />All work shall be carried out in compliance with these SPECIFICATIONS and in conformance with the lines, <br />grades, and dimensions as shown on the DRAWINGS. <br />1.02 RELATED SECTIONS <br />Refer to the following Sections for related work: <br />Section 02200.0 Earthworks <br />Section 03300.0 Cast -in -place Concrete <br />PART 2: SPECIFICATIONS AND INSTALLATION <br />2.01 MATERIAL SPECIFICATIONS <br />A. Rip rap shall consist of hard, dense, and durable stone, angular in shape, and resistant to weathering. <br />Rounded stone or boulders will not be accepted as riprap material. The stone shall have a specific <br />gravity of at least 2.5. Each piece shall have its greatest dimension not greater than three times its <br />• least dimension. If approved by CERTIFYING ENGINEER, removed concrete may be used for <br />riprap provided it meets the other requirements of this section. <br />B. Material used for riprap will be approved by CERTIFYING ENGINEER if, by visual inspection, <br />the rock is determined to be sound and durable. MANAGER and CERTIFYING ENGINEER may <br />require CONTRACTOR to furnish laboratory results to verify that the material meets <br />SPECIFICATIONS. At the request of MANAGER, CONTRACTOR shall furnish laboratory test <br />results indicating that the material meets the requirements for strength as indicated in the following <br />table. <br />Test DescA ton <br />Test Method <br />I Specification Requirement <br />Point Load Tensile Strength <br />ISRM RTH 325 -89 <br />1 300 psi (min) <br />C. Rip rap shall conform to the gradation requirements given in the following table: <br />• <br />Section 02271 <br />Rip Rap <br />Page 1 of 2 <br />September 3, 2008 <br />Revision 1 <br />S: \Projects \1125E CCV CQAV - Tech Specs \02271.r1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.