PART 3: EXECUTION <br />3.01 EXCAVATION <br />A. The CONTRACTOR will be responsible for the safety of temporary construction slopes. <br />CONTRACTOR shall inspect all temporary and permanent open -cut excavations on a regular basis <br />for signs of instability. Should signs of instability be noted, CONTRACTOR shall immediately <br />undertake remedial measures and shall notify MANAGER immediately. Permanent cut slopes shall <br />be left in smooth, safe, and stable condition at the end of the workday. <br />B. CONTRACTOR shall conduct all excavation and shoring operations in compliance with applicable <br />Colorado State and Federal government laws and regulations. <br />3.02 FILL PLACEMENT <br />A. Structural Fill <br />CONTRACTOR shall condition, place and compact Structural Fill by a method <br />compaction technique, as discussed in Section 2200.0. <br />Maximum rock size for rock fill shall be two - thirds of the compacted lift thickness, unless <br />otherwise approved by MANAGER, DESIGN ENGINEER, and CERTIFYING <br />ENGINEER. CONTRACTOR shall remove oversize materials from fills at no additional <br />cost to CC &V. <br />0 B. Select Structural Fill <br />CONTRACTOR shall condition and compact the Select Structural Fill using a method <br />specification on 3 -foot thick lifts that result in a firm surface that will be approved by the <br />CERTIFYING ENGINEER. <br />C. Coarse Shaft Backfill <br />1. Coarse Shaft Backfill shall be placed in the underground workings as part of remediation, as <br />shown in the DRAWINGS. <br />2. CONTRACTOR shall compact and condition the final surface of the Coarse Shaft Backfill <br />using a method specification that results in a firm surface that will be approved by <br />CERTIFYING ENGINEER. <br />3.03 NATIVE MATERIAL <br />For the remediation of shafts greater than 25 feet, which are currently backfilled with native material, <br />CONTRACTOR shall excavate the current native backfill to a depth of 25 feet below Soil Liner Fill subgrade <br />elevation. The surface of the native material at this elevation will then be compacted using a method <br />specification that results in a firm surface that will be approved by CERTIFYING ENGINEER. <br />CONTRACTOR shall then remediate the underground working using Coarse Shaft Backfill, Cement Plug, <br />and Cemented Rockfill as shown on the DRAWINGS. <br />Section 02210 Page 2 of 3 September 3, 2008 <br />Underground Working Remediation Revision 1 <br />SAProjects \1125E CCV CQA \I - Tech Specs \02210.rt.doc <br />