Laserfiche WebLink
amec <br />11. Certification that extrudate to be used is composed of the same resin as the geomembrane to <br />be used. <br />C. Submittals By CONTRACTOR to MANAGER during the course of the work. <br />1. Daily reports detailing arrival and departure times, the personnel present on -site, the <br />progress of the Work, the arrival of materials, daily square footage deployed and seamed, <br />daily square footage of geomembrane approved by the CQA Monitor and any problems <br />encountered. <br />2. Subgrade surface acceptance certificates for each area to be covered by the lining system, <br />signed by CONTRACTOR. <br />D. Without limiting the provisions of the Contract, the CONTRACTOR shall warrant the Work to <br />MANAGER in accordance with the following: <br />1. The geomembrane supplied is suitable for the environmental conditions at the site and the <br />service conditions as described in this SPECIFICATION. <br />2. The geomembrane supplied meets or exceeds all published SPECIFICATIONS as <br />referenced by the SPECIFICATION. <br />3. The geomembrane are free of defects in materials and workmanship. <br />4. The CONTRACTOR shall repair or replace all defects in the material detected on -site, <br />including uncovering and recovering the work, in compliance with the SPECIFICATIONS <br />at no additional cost to CC &V. <br />5. The CONTRACTOR shall repair any detected leaks in any seams (Manufactured or field <br />joined), including uncovering and recovering the work, in compliance with the <br />SPECIFICATIONS at no additional cost to CC &V. <br />1.03 QUALITY ASSURANCE <br />A. Manufacturing Qualifications <br />1. The MANUFACTURER(s) shall have experience in the manufacture of the type of <br />geomembrane that is being installed at the Cresson Project totaling at least five completed <br />facilities totaling a minimum of 5,000,000 square feet between all five facilities. <br />2. The MANUFACTURER shall provide sufficient production and qualified personnel to meet <br />the demands of the work and shall have an internal quality control program for its product. <br />3. The MANUFACTURER shall permit MANAGER, DESIGN ENGINEER, and/or <br />CERTIFYING ENGINEER or their authorized representative to visit the manufacturing <br />plant. <br />B. Geomembrane Installation Qualifications (INSTALLER) <br />1. INSTALLER shall be the MANUFACTURER or an approved CONTRACTOR trained <br />and licensed to install the MANUFACTURER's geomembrane. <br />Section 02776 Page 3 of 22 September 3, 2008 <br />Geomembrane Revision 1 <br />SAProiects \1125E CCV CQA \I - Tech Speos\02776.0.doc <br />