Laserfiche WebLink
M-11 M <br />■ This meeting will be documented by the MANAGER or his designee and copies distributed to <br />all parties. <br />5.02 PROGRESS MEETINGS: <br />The MANAGER will hold a daily progress meeting, either before the start of work or at the completion of <br />work. At a minimum, this meeting will be attended by the CQA Monitor, INSTALLER and <br />CONTRACTOR. The purpose of this meeting will be to: <br />• review all the previous day's accomplishments and activities; <br />• review scheduled work location and activities for the day; and, <br />• discuss any problems or potential construction problems. <br />• This meeting will be documented by the CQA Monitor. <br />5.03 DEFICIENCY MEETINGS: <br />Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a minimum, <br />these meetings will be attended by the CQA Monitor and INSTALLER or CONTRACTOR. If the <br />problem relates to a design issue, the MANAGER, DESIGN ENGINEER and CERTIFYING <br />ENGINEER should also be present. The meeting will be documented by the CQA Monitor. <br />PART 6.0 GEOSYNTHETICS CONSTRUCTION QUALITY ASSURANCE <br />Construction of the valley leach facility or specified geosynthetics must be in compliance with the design <br />plans and SPECIFICATIONS. CC &V shall implement a CQA monitoring and testing program to ensure <br />construction compliance by the CONTRACTOR. The quality assurance program shall consist of <br />reviewing CONTRACTOR quality control submittals, material conformance testing, construction <br />monitoring and testing. <br />The types of geosynthetics used in the valley leach facility construction include polyethylene pipe, <br />geomembrane and geotextile. These geosynthetics are defined in the project SPECIFICATIONS. Prior to <br />and during construction, these geosynthetics shall be sampled and tested to determine if they meet project <br />SPECIFICATIONS. All tests shall be performed in a geosynthetics laboratory approved by the <br />MANAGER and CERTIFYING ENGINEER. <br />6.01 REVIEW QUALITY CONTROL SUBMITTALS: <br />Prior to geosynthetic installation, the CQA Monitor shall review the INSTALLER'S quality control <br />submittals to evaluate or confirm that these materials meet project requirements. The CQA Monitor shall <br />review the QC submittals that are outlined in Section 2776 ( Geomembrane) and Section 02777 ( Geotextile) <br />of the SPECIFICATIONS. <br />6.02 GEOMEMBRANE CONFORMANCE TESTING: <br />Prior to geosynthetic installation, the CQA Monitor shall obtain samples of the geomembrane for <br />conformance testing to confirm that these materials meet project requirements. The conformance testing <br />frequency shall be at a rate of 1 test per 150,000 square feet. Samples shall be taken across the entire width <br />of the roll and shall not include the first 3 feet. The samples shall be 3 feet wide by the roll width. The <br />CQA Monitor shall mark the machine direction, roll number on the sample, and date the sample was <br />Section 01400.2 Page 5 of 11 September 3, 2008 <br />Geosynthetic GQA Plan Revision 1 <br />SAPro1ects \1125E CCV CQA \I - Tech Specs \01400.2 rl.doc <br />