• such as unsatisfactory test results, will be dealt with directly between the CQA Monitor, INSTALLER , <br />and/or CONTRACTORS. <br />If there is a disagreement among the DESIGN ENGINEER, CERTIFYING ENGINEER and/or <br />MANAGER that can not be resolved among themselves, MANAGER shall present the matter to CC &V <br />with MANAGER related recommendations and CC &V shall decide the matter with such decision being <br />final. <br />PART 4.0 DEFICIENCIES <br />When deficiencies (items that do not meet project requirements) are discovered, the CQA Monitor shall <br />immediately determine the nature and extent of the problem and notify the INSTALLER or <br />CONTRACTOR. If unsatisfactory test results identify a deficiency, additional tests will be performed to <br />define the extent of the deficient area. <br />The INSTALLER or CONTRACTOR shall correct the deficiency to the satisfaction of the CQA Monitor. <br />If the CONTRACTOR is unable to correct the problem, the CQA Monitor will notify the MANAGER and <br />CERTIFYING ENGINEER who will assist in problem resolution. If the solution involves a design <br />revision, the DESIGN ENGINEER shall also be contacted. <br />The corrected deficiency shall be retested and/or approved by the MANAGER and CERTIFYING <br />ENGINEER before any additional related work is performed by the INSTALLER or CONTRACTOR. <br />All retests and related documentation shall be recorded by the CQA Monitor and included in the final <br />Construction Certification Report. <br />• PART 5.0 MEETINGS <br />This section identifies and describes the meetings to be held during the coarse of the construction. <br />Meetings shall be held in order to clearly define construction activities and goals in order to facilitate <br />construction. <br />5.01 PRECONSTRUCTION MEETING: <br />The MANAGER will hold a preconstruction meeting at the site prior to the start of construction. The <br />DESIGN ENGINEER, MANAGER, CERTIFYING ENGINEER, CQA Monitor, INSTALLER, <br />CONTRACTOR, and others designated by the MANAGER shall attend this meeting. The purpose of this <br />meeting will be to: <br />• review the construction DRAWINGS, CQA Plan, and project SPECIFICATIONS; <br />• define the responsibilities of each party; <br />• define lines of communication and authority; <br />• review method of documentation, testing procedures, and reporting inspection data; <br />• establish testing protocols and procedures for correcting and documenting construction <br />deficiencies; and, <br />■ discuss any changes that may be needed to ensure that construction will be completed in <br />compliance with the design. <br />Section 01400.2 Page 4 of 11 September 3, 2008 <br />Geosynthetic CQA Plan Revision 1 <br />SAProjects\7125E CCV CQA \I - Tech Specs \01400.2 rt.doc <br />