My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
12/30/2009 8:54:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. E, Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />obtained and forward the sample to a third party geosynthetic laboratory. As a minimum, the following <br />conformance tests shall be conducted; with project requirements outlined in Section 02776, Article 2.01: <br />■ Geomembrane: density (ASTM D1505) <br />carbon black content (ASTM D1603) <br />thickness (GRI -GM8) <br />tensile strength (ASTM D638) <br />All conformance tests shall be performed in compliance with the project SPECIFICATIONS. The CQA <br />Monitor shall review the test results and shall report any nonconformance to the MANAGER, <br />CERTIFYING ENGINEER and the Geosynthetics Installation CONTRACTOR. <br />6.03 CONSTRUCTION MONITORING AND TESTING: <br />The CQA Monitor shall monitor and test all geosynthetic components of the construction to verify that the <br />construction is in compliance with the project SPECIFICATIONS. The CQA Monitor shall identify <br />inadequate construction methodologies or materials which may adversely impact the performance of the <br />facility being constructed and existing structures. Visual observations throughout the construction process <br />shall be made to ensure that the materials are placed to the lines and grades as shown on the DRAWINGS. <br />• <br />The CQA monitor shall review the following submittals by INSTALLER during the project: <br />• verification that a qualified land surveyor has verified all lines and grades; and <br />• subgrade surface acceptance certificates for each area to be covered by the lining system, <br />signed by the INSTALLER. <br />The CQA Monitor shall: <br />• Inspect all geosynthetic materials delivered to site. The CQA Monitor shall document any <br />damage and notify MANAGER; <br />• obtain geosynthetic packaging identification slips for verification and generation of an on -site <br />materials inventory; <br />• observe subgrade conditions prior to geosynthetics installation and verify that any <br />deficiencies, as defined in Section 02200 of the SPECIFICATIONS, are corrected; <br />• observe permanent anchoring of geosynthetics to verify that design and project <br />SPECIFICATIONS are met; <br />■ observe that required overlap distances are met; <br />■ monitor and record ambient air temperatures; <br />■ verify that no continuous horizontal seams are placed on slopes unless approved by <br />CERTIFYING ENGINEER; and, <br />• <br />Section 01400.2 Page 6 of 11 September 3, 2008 <br />Geosynthetic CQA Plan Revision 1 <br />SAProjects\7125E CCV CQA \I - Tech Specs \01400.2 rl.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.