My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-21_REVISION - M1980244 (35)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-12-21_REVISION - M1980244 (35)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:23 PM
Creation date
12/30/2009 8:54:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/21/2009
Doc Name
QA Liner Recert- App. D, Weekly Reports
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contouring was performed using various CAT dozers and CAT excavators. Material generated <br />as the cut progressed was pushed down the slope. <br />E) Overburden to Stockpile <br />1) VLF <br />No work performed during the week. <br />F) Cut to Fill <br />1) VLF <br />A CAT 385 excavator and a John Deere 850 excavator were used to excavate structural fill <br />material in the following areas: between stations F4 +00 ( + / -) and F9 +00 ( + / -), approximately 0 <br />to 150 feet right of centerline; between stations H6 +00 ( + / -) and 1-19 +00 ( + / -), approximately 0 <br />to 40 feet left of centerline; and between stations J26 +00 ( + / -) and J28 +00 ( + / -), approximately <br />150 to 175 feet right of centerline. The structural fill material was loaded into CAT 777 haul <br />trucks. <br />Prior to structural fill placement, existing fill temperature were monitored and to be or above <br />39 °F. Ambient were monitored, on an hourly basis, by an AMEC representative during fill <br />placement. No fill material was placed during ambient temperatures less than 32 °F. <br />Structural fill was placed in the following areas: between stations A32 +00 ( + / -) and A34 +00 <br />( + / -), approximately 250 to 300 feet left of centerline; between stations A45 +00 ( + / -) and <br />A49 +50 ( + / -), approximately 0 to 100 feet left of centerline; between stations B4 +00 ( + / -) and <br />B7 +00 ( + / -), approximately 100 feet left of centerline to 100 feet right of centerline; between <br />stations D0 +00 ( + / -) and D4 +50 ( + / -), approximately 0 to 150 feet right of centerline; and <br />between stations F1 +00 ( + / -) and F2 +25 ( + / -), approximately 0 to 100 feet right of centerline. <br />Structural fill was placed in 18" to 24" lifts using various CAT dozers. Each lift was moisture <br />conditioned using a CAT 773 water truck (when necessary) and compacted using a 10 -ton <br />vibratory smooth drum compactor, passing over the entire fill surface at least 4 times (method <br />compaction technique is applicable). <br />Structural fill (processed ore) was placed within the Phase IVa VLF between stations G2 +00 <br />( + / -) and G13 +00 ( + / -), approximately 50 to 125 feet left of centerline and between stations <br />G 16 +00 ( + / -) and G29 +00 ( + / -), approximately 50 to 125 left of centerline. Fill material <br />(processed ore) was excavated from the Phase IVc re- certification area and the old LOB haul <br />road using a CAT 375 excavator loading the material into 40 -ton articulating haul trucks. <br />Structural fill was placed using a CAT D -8 dozer in 12" loose lifts and moisture conditioned as <br />needed using a CAT 773 water truck. Compaction was achieved using a 10 -ton vibratory <br />smooth drum compactor. Nuclear density testing was performed with results averaging 95% of <br />maximum dry density. Moisture density relations were obtained in accordance with ASTM <br />D698 -07. <br />Blast pattern drilling was performed in the following areas: between stations A6 +00 ( + / -) and <br />A8 +50 ( + / -), approximately 0 to 75 feet left of centerline; between stations 112 +00 ( + / -) and <br />H5 +40 ( + / -), approximately 0 to 75 feet left of centerline; between stations J 1 +25 ( + / -) and <br />J2 +25 ( + / -), approximately 100 to 130 feet left of centerline; and between stations J4 +50 ( + / -) <br />and J5 +50 ( + / -), approximately 225 to 275 feet left of centerline using three track mounted <br />VLF Weekly Report WE 11.07.09.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.