E-�,fi� $ 3nwi,nn•:�cnl�i. <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: November 7, 2009 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Reporting Period: 11/01/09 through 11/07/09 <br />Days <br />5 <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 30 °F to 46 ° F ( + / -) High: 54 °F to 65T <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES: Haulage with CAT 777 haul trucks not performed Monday (11/2/2009) <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />No work performed during the week. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Subgrade Preparation <br />1) VLF <br />Subgrade preparation was performed at the Phase IVa recertification area (approximately <br />between stations G14 +00 ( + / -) and G15 +00 ( + / -)). The existing fill in the area was shaped, <br />moisture conditioned, and compacted allowing for soil liner fill placement. The area was <br />inspected by an AMEC representative and found to be acceptable for soil liner fill placement. <br />D) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations E15 +00 ( + / -) and <br />E16 +00 ( + / -), approximately 75 to 100 feet right of centerline; between stations H2 +00 ( + / -) <br />and H4 +00 ( + / -), approximately 20 feet left of centerline to 20 feet right of centerline; and <br />between stations J0 +50 ( + / -) and J3 +00 ( + / -), approximately 50 to 300 right of centerline. <br />VLF Weekly Report WE 11.07.09.D.doc <br />