Laserfiche WebLink
October 2004 -3- 043 -2170 <br />portions of the temporary storm water diversion channel, installation of 24 -inch high <br />density polyethylene (HDPE) pipe, installation of 26 -inch corrugated steel pipe <br />(CSP), installation of structural concrete, placement of rip rap, placement of inlet <br />and outlet structures, and placement of Pipe Bedding Material (PBM). Golder <br />performed CQA laboratory testing of grain size and Atterberg limits during <br />construction of the diversion channels. <br />• Golder monitored construction of the Leak Detection Trench (LDT), including <br />verification that Ames excavated the trench to minimum required dimensions and <br />placed materials as specified. Golder performed CQA laboratory testing including <br />grain size and Atterberg limits on Leak Detection Fill (LDF) placed in the LDT. <br />• Golder monitored site grading, including slope re- contouring and fill placement, lift <br />thickness, moisture conditioning, temperatures, compactive effort, and use of <br />suitable material for SF. Golder performed CQA laboratory testing of grain size <br />and Atterberg limits. <br />• Golder visually monitored subgrade preparation to confirm that the subgrade <br />surface was unyielding, free of organic matter and other unsuitable materials, and <br />that the subgrade surface was compacted prior to Soil Liner Fill (SLF) placement. <br />• Golder visually monitored the placement and compaction of SLF including <br />observation of depth verification performed by Ames, particle size, moisture <br />conditioning, and compaction of the fill. Golder performed in -place density and <br />moisture content testing, and performed CQA laboratory testing of grain size, <br />moisture content, Atterberg limits, compaction, and permeability. Golder also <br />• provided visual monitoring of the SLF surface preparation and moisture <br />conditioning for geomembrane deployment, including verification that the surface <br />was proof-rolled, compacted, and hand - worked so as to be free of desiccation <br />cracks, abrupt grade changes, and sharp stones or objects. Golder also observed the <br />backfill and compaction of the anchor trenches. <br />• Golder visually monitored the placement of Drain Cover Fill (DCF) in the OSA, <br />including verification of lift thickness and grade control, identification of deleterious <br />materials, and verification that care was exercised in fill placement to avoid <br />geomembrane damage. Golder performed CQA laboratory testing of grain size and <br />Atterberg limits. <br />Golder monitored the installation of High Volume Solution Collection System <br />(HVSCS) piping. Golder visually verified that pipes were installed to the lines and <br />grades shown on the plans. <br />Golder monitored the ambient air temperatures and the temperature of all fills, <br />including SLF, in accordance with project specifications. <br />1.2.2 COA/COC M onitoring of Geosynthetics Installation <br />Golder provided CQA monitoring of geosynthetics used for the Phase We OSA. CQC services <br />• provided by Golder consisted of performing geosynthetics inventory and checking quality control <br />1:v 04�2r7a9+oa%Cen- Qeruvc- 10OM432IX040 12U&CenPWcd. Golder Associates <br />